K114 Issue No. 9
5 - 8
Testing and Fault Finding
5.6 Further Testing
The following tests should only be carried out if a pneumatic leak or a controller
instability is suspected.
Test Environment and Preliminary Operations
These tests should be carried out in a room with a stable temperature environment
within the operating temperature range. The room must be free from drafts.
Review and become familiar with the whole of the test procedure before beginning the
test procedure.
The unit must be thermally stable; switch on and leave the unit for at least one hour to
achieve thermal stability.
Change the units to mbar as follows:
(1)
Press
SETUP
then select [UNITS]. Repeatedly select [NEXT] until the
display shows “mbar”.
(2)
Select [SAVE] and then press
CLEAR/QUIT
twice and the display now shows Ps and Pt
in units of mbar.
Pressure Leak Check
This section verifies that the unit is leak tight under positive pressure conditions.
(1)
Press
LEAK MEASURE/CONTROL
to enter control mode.
The display shows “Aim” in place of “Leak Measure”.
(2)
Enter a Ps aim of 1016 mbar by pressing:
ALT/Ps, 1, 0, 1, 6, ENTER
.
(3)
Enter a Qc aim of 272 mbar by pressing:
SPEED/Qc, 2, 7, 2, ENTER
.
Wait for the aim values to be achieved then wait for 1 min.
(4)
Press
LEAK MEASURE/CONTROL
to return to Leak Measure mode.
(5)
Press
RATE TIMER
and select [WAIT 05:00], [TIME 01:00]. Observe that the
"Waiting" time is shown on the display as it counts down, followed by the "Timing"
time.
(6)
At the end of the "Timing" period, the display shows the rate of change of
Ps, Qc and Pt with a “
T
” to indicate timed average.
Summary of Contents for Druck ADTS 405
Page 2: ... General Electric Company All rights reserved ...
Page 4: ...K114 Issue No 9 ...
Page 32: ...K114 Issue No 9 2 10 Druck ADTS 405 User Manual F IGURE 2 4 ADTS 405 G ENERAL VIEW ...
Page 33: ...K114 Issue No 9 Installation 2 11 2 F IGURE 2 5 ADTS 405 R EAR P ANEL VIEW ...
Page 41: ...K114 Issue No 9 Druck ADTS 405 User Manual 3 7 3 Control Mode ...
Page 43: ...K114 Issue No 9 Druck ADTS 405 User Manual 3 9 3 Go to Ground ...
Page 50: ...K114 Issue No 9 3 16 Operation FIGURE 3 6 TRIPLE DISPLAY FIGURE 3 5 DUAL DISPLAY ...
Page 72: ...K114 Issue No 9 4 6 Maintenance INTENTIONALLY LEFT BLANK ...
Page 92: ...K114 Issue No 9 5 20 Testing and Fault Finding INTENTIONALLY LEFT BLANK ...