Thickness profiles with the B-scan
5 Operation
DMS Go+
Edition 4 (05/2014)
5-43
Switching the B-scan display on
You can switch the B-scan display on any time.
The display of the thickness profile starts automatically
at the first successful coupling after switching the B-
scan display on.
Simultaneously with the B-scan display, the DMS Go+
determines the minimum reading detected during the
measurements. At the end of the selected display time,
this value is displayed above the B-scan, and you can
save the reading by pressing the function key 2 (func-
tion
SEND
).
Note
The processes of saving readings and docu-
menting measurement results are described
in detail in chapter 6.
– In the function group
MEASURE
, select the function
MODE
.
– Choose the option
B-SCAN
in order to switch the B-
scan display on.
Setting the display time
The display time (in seconds) defines the period of time
during which the thickness profile should be recorded.
At the end of this time (maximum 30 seconds), the in-
strument stops the measurements.
The scaling of the X-axis in the B-scan corresponds to
the selected display time.
– In the function group
MEASURE
, select the function
TIME
.
– Set the required display time.
Summary of Contents for DMS Go+
Page 1: ...DMS Go Technical Reference and Operating Manual ...
Page 3: ...DMS Go Edition 4 05 2014 0 3 Function groups and functions ...
Page 4: ...0 4 Edition 4 05 2014 DMS Go Function groups and functions cont d ...
Page 8: ...0 8 Edition 4 05 2014 DMS Go ...
Page 17: ...DMS Go Edition 4 05 2014 1 1 Introduction 1 ...
Page 41: ...DMS Go Edition 4 05 2014 2 1 Standard package and accessories 2 ...
Page 54: ...2 Standard package and accessories Recommended accessories 2 14 Edition 4 05 2014 DMS Go ...
Page 55: ...DMS Go Edition 4 05 2014 3 1 Initial start up 3 ...
Page 67: ...DMS Go Edition 4 05 2014 4 1 Principles of operation 4 ...
Page 78: ...4 12 Edition 4 05 2014 DMS Go ...
Page 79: ...DMS Go Edition 4 05 2014 5 1 Operation 5 ...
Page 133: ...DMS Go Edition 4 05 2014 6 1 Data Recorder 6 ...
Page 174: ...6 Data Recorder Documenting measurements 6 42 Edition 4 05 2014 DMS Go ...
Page 175: ...DMS Go Edition 4 05 2014 7 1 Special functions of the DMS Go TC 7 ...
Page 189: ...DMS Go Edition 4 05 2014 8 1 Maintenance and care 8 ...
Page 195: ...DMS Go Edition 4 05 2014 9 1 Interfaces and Peripherals 9 ...
Page 199: ...DMS Go Edition 4 05 2014 10 1 Appendix 10 ...
Page 228: ...10 Appendix Recycling directives 10 30 Edition 4 05 2014 DMS Go 4 5 1 4 ...
Page 231: ...Recycling directives 10 Appendix DMS Go Edition 4 05 2014 10 33 2 ...
Page 234: ...10 Appendix Recycling directives 10 36 Edition 4 05 2014 DMS Go 1 3 ...
Page 235: ...Recycling directives 10 Appendix DMS Go Edition 4 05 2014 10 37 1 1 ...
Page 236: ...10 Appendix Recycling directives 10 38 Edition 4 05 2014 DMS Go 5 ...
Page 237: ...Recycling directives 10 Appendix DMS Go Edition 4 05 2014 10 39 4 7 ...
Page 238: ...10 Appendix Recycling directives 10 40 Edition 4 05 2014 DMS Go 3 6 6 6 7 ...
Page 242: ...10 Appendix Recycling directives 10 44 Edition 4 05 2014 DMS Go ...
Page 243: ...DMS Go Edition 4 05 2014 11 1 Specifications 11 ...
Page 252: ...11 10 Edition 4 05 2014 DMS Go ...