
GE Healthcare
MR5047 SV
Lab Guide
Page: 23 of 24
13. MCR III Tool Lab
Description:
This lab will familiarize the student with the MCR3 tool hardware setup
for Port A and Express PA coil, and software usage.
Time Required:
1 Hour
Learning
Objective(s):
Navigate the service documentation
Set up the hardware connection for Port A and Express PA coil
Know how to run the software and read the test result
Support Materials
Required:
Service Methods procedures 5364191 on disk, or as loaded onto
system computer. Refer to MCR III Tool for MR355/360.
(
http://3.28.123.26:8000/mr/cdrom/5364191-
2EN/root/data/Signa_EXCITE/content/1084956.htm
)
Tools Required:
MCR III Tool
Express PA Coil RF Cable Assy for MCR III Tool
Express PA Coil DC Cable Assy for MCR III Tool
Safety
Considerations:
Strong Magnetic Field! Ferrous materials can become dangerous
projectiles in the presence of the magnetic field Produced by the
Signa Magnet. Do not Bring any ferromagnetic tools or equipment
into the magnet room.
Steps:
1. MCR III Diagnostic
Use documented procedure in Direction 5364191:
Troubleshooting / Image Quality Troubleshooting Tools / MCR
III Tool for Optima MR360 / Brivo MR355
a. Perform Port A, Express PA coil test
Questions:
1. What is the function of the two-pin connector?
__________________________________________________
Review:
Questions for instructor:
______________________________________________________
______________________________________________________
______________________________________________________
Summary of Contents for BRIVO MR355
Page 3: ...1 ...
Page 4: ...2 ...
Page 5: ...3 ...
Page 7: ...5 ...
Page 8: ...6 ...
Page 11: ...9 The portable GasWatch2 Oxygen sensor as pictured above part number is 5111049 ...
Page 14: ...12 ...
Page 15: ...13 ...
Page 16: ...14 ...
Page 17: ...15 ...
Page 18: ...16 ...
Page 20: ...18 ...
Page 21: ...19 ...
Page 33: ...31 ...
Page 38: ...36 ...
Page 39: ...37 ...
Page 41: ...39 ...
Page 43: ...41 ...
Page 44: ...42 ...
Page 45: ...43 ...
Page 47: ...45 ...
Page 48: ...46 ...
Page 49: ...47 ...
Page 50: ...48 ...
Page 51: ...49 ...
Page 52: ...50 ...
Page 53: ...51 ...
Page 54: ...52 ...
Page 55: ...53 ...
Page 56: ...54 ...
Page 62: ...60 ...
Page 65: ...63 ...
Page 66: ...64 ...
Page 67: ...65 ...
Page 68: ...66 ...
Page 69: ...67 ...
Page 71: ...69 ...
Page 78: ...Image can be previewed in this new version of Image Management 76 ...
Page 79: ...77 ...
Page 80: ...78 ...
Page 81: ...79 ...
Page 82: ...80 ...
Page 85: ...83 ...
Page 88: ...86 ...
Page 89: ...87 ...
Page 90: ...88 ...
Page 91: ...89 ...
Page 96: ...94 ...
Page 97: ...95 ...
Page 102: ...100 This slide shows the detailed configuration of THTF host ...
Page 104: ...102 ...
Page 105: ...103 ...
Page 106: ...104 ...
Page 112: ...110 ...
Page 116: ...114 ...
Page 117: ...115 ...
Page 124: ...122 ...
Page 129: ...127 ...
Page 131: ...129 ...
Page 134: ...132 The part is the 200V DC power supply for three XFAs and 200V to 700V DC DC power supply ...
Page 135: ...133 ...
Page 136: ...134 Three sets of DC700V and 700V are isolated ...
Page 142: ...140 ...
Page 143: ...141 ...
Page 147: ...145 ...
Page 150: ...148 ...
Page 154: ...152 ...
Page 170: ...168 ...
Page 171: ...169 ...
Page 172: ...170 ...
Page 174: ...172 ...
Page 176: ...174 ...
Page 180: ...178 ...
Page 185: ...183 ...
Page 186: ...184 ...
Page 187: ...185 ...
Page 188: ...186 The report file is stored in export home signa bin ...
Page 189: ...187 ...
Page 190: ...188 ...
Page 192: ...190 The RF and DC cables for Express PA Coil Cradle mode are shipped with the system ...
Page 193: ...191 ...
Page 220: ...Page 2 System Cabinet 1 2 3 4 5 6 2 3 4 5 6 1 ...
Page 221: ...Page 3 System Cabinet 1 2 3 4 5 6 1 3 4 2 5 6 ...
Page 222: ...Page 4 System Cabinet 1 2 3 4 5 6 4 5 6 2 3 1 ...
Page 223: ...Page 5 System Cabinet 1 2 3 4 5 6 7 8 9 10 11 2 3 4 5 6 7 8 9 10 11 1 ...
Page 224: ...Page 6 Magnet Side Kit 1 2 3 1 2 3 ...
Page 225: ...Page 7 Rear Pedestal 1 2 3 4 5 6 7 4 3 1 2 5 6 7 ...
Page 226: ...Page 8 LPCA 1 2 1 2 ...