Purchaser Site Preparation Work
This list below will describe many of the items to consider when planning for a system replacement
or designing a room for new equipment
•
Determine room dimensions and verify that doorways are large enough for the scanner system.
•
Install appropriate conduits and duct work for system cables. If additional components are
required in the CT suite, their connection consideration must be determined and completed.
•
Install junction boxes of correct size with covers at locations shown in installation plan.
•
A1 main disconnect installation
•
Install power supply of correct voltage output and adequate KVA rating.
•
Install local disconnects, including proper over-current protection.
•
Install “steelwork” or other suitable support work for mounting equipment on walls or from
ceiling.
•
Camera should be on-site at the time of installation.
•
Complete all suite and room alterations and modifications.
•
Verify that room shielding is adequate for the system being installed
•
Review structural requirement - including floor vibration, levelness, and thickness
•
Review HVAC requirements including system regulation and patient comfort.
•
Review operational clearances to see if your daily used items fit, such as beds and carts.
•
Emergency medical equipment should also be considered
•
Storage cabinets and sink (if required) must be shown on the site print
•
These contractors and others may be required to help confirm that the site meet all installation
requirements:
-
Structural Engineer and /or Architect
-
HVAC contractor
-
Electrical contractor
-
Qualified radiological health physicist
The above items can be found in chapter 2 through 9 in this manual.
It is suggested that this work be completed at least three days prior to delivery
2.3
Manufacturer’s System Level Siting Requirements
These siting requirements are the minimum that must be met in order to install a new or replacement
system.
•
Network Communication in place and active
•
Meets all scan room regulatory and service requirements
•
Meets all minimum scan room structural requirements
•
Meets minimum scan room HVAC requirements
•
Meets minimum scan room electrical requirements
•
Reviewed radiation protection section in the Pre-Installation manual
•
All in room items shown on the final GE Healthcare site print and the final print is on site
•
No construction in the scan room or neighboring suite areas
It is suggested that this work be completed at least three days prior to delivery