Page 34
Chapter 1 - Introduction
Table 1-4 Equipment Compatibility
GE
Cust
Equipment
Must be completed 5 weeks before scheduled delivery date
Y N
Y N
Has the order been reviewed for completeness and compatibility with existing equipment?
Typical equipment:
Remote monitors ____ AW relocation ____ Cardiac option ____ Injectors ____
Are interfaces to existing and/or new accessories ordered and planned for accordingly?
Have the following peripheral locations been included in the site drawings?
EKG monitor___ Injector control___ Laser camera ___ UPS ___ 2
nd
Monitor___
Will GE Healthcare provide additional services per contract negotiations?
Are correct length cables on order?
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
Table 1-5 Network Connections
GE
Cust
Network Installation and Setup
Must be completed 5 weeks before scheduled delivery date
Y N
Y N
Have IP addresses and Host Names been obtained?No___ Yes ___
Will a network camera be used?No___ Yes ___
Mandatory:
Is the network installed, are network jacks installed, and is the entire network tested?
Mandatory:
Broadband VPN installed/setup?
Mandatory:
Are network software options ordered ____ HIS RIS option ___
DICOM print ___ AW ____
Optional:
Has modem option ordered? _____ (Requires a site escalation)
Optional:
Is the BrightSpeed service telephone line identified and installed for InSite?
(Electrical,
mechanical, etc.)
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
Table 1-6 Miscellaneous Tasks
GE
Cust
Other
Must be completed before the scheduled delivery date
Y N
Y N
Arrangements made in the schedule to allow adequate time for remodeling, if required (such as
wall, floor, or ceiling repair work, painting, other cosmetic finishes)
Have arrangements been made to clean the floor
after
equipment removal and
prior
to the
installation of the new equipment?
Is de-installation of existing equipment required? No__
Yes ___ Removal date ___________
Is there a trade-in of existing equipment? No __
Yes __ GoldSeal _____________
Delivery route identified and verified with the proper hospital personnel? No__ Yes __
Elevators and doors checked for size and weight constraints? No__ Yes __
Have appropriate arrangements been made with traffic for delivery?No__ Yes __
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒
❒ ❒