Section 9 - OPERATIONAL TESTING
11
9. OPERATIONAL TESTING
To verify that the system monitor is functional apply power at the Power Input Module. The LED
indicating that the supplies are OK should turn on after 2 seconds.
CAUTION
Improper operation may
occur. Set -VT Jumpers in
the System Monitor and
Power Supply to the same
voltage (-18 VDC or -24
VDC).