WARNING
Take extra care when moving tubing or bottles with flammable
liquids to avoid spillage.
CAUTION
Reversed Phase Chromatography (RPC) runs with 100% acetoni-
trile in ÄKTA pure. Always replace the PEEK tubing between the
used system pump and the pump pressure monitor with orange
PEEK tubing, i.d. 0.5 mm, before running RPC with 100% acetonitrile.
The tubing to be replaced is green for 25 ml/min systems and beige
for 150 ml/min systems. Set the System pressure alarm to 10 MPa
for 25 ml/min systems.
Installing and moving the
instrument
WARNING
Protective ground. The product must always be connected to a
grounded power outlet.
WARNING
Supply voltage. Before connecting the power cord, make sure that
the supply voltage at the wall outlet corresponds to the marking
on the instrument.
WARNING
Power cord. Only use power cords with approved plugs delivered
or approved by GE.
ÄKTA pure Operating Instructions 29022997 AF
21
2 Safety instructions
2.1 Safety precautions