5.3
Prime buffer inlets and purge system pumps
Introduction
Before you start the system pumps, it is important to do the following:
•
Prime the inlets (fill the buffer inlets with liquid).
•
Purge the system pumps (remove air from the pump heads).
For instructions on how to prime the inlets and purge the system pumps, see
Prime inlets and purge pump heads, on page 85
.
ÄKTA avant Operating Instructions 29101556 AB
111
5 Prepare the system for a run
5.3 Prime buffer inlets and purge system pumps