49-7823
9
Installation Instructions
INST
ALLA
TION INSTRUCTIONS
3. PREPARE THE AIR CONDITIONER
A.
Install the top mounting rail with 4 Type A screws
from the outside of the case.
B.
Apply the weather seals provided to the bottom,
top and sides of the window to the seal around
the perimeter of the air conditioner.
C.
Slide the side curtain panels into the side panel
rails.
D.
Slide left and right side curtain frames into top
and bottom rails. Make sure that side curtains
snap into side of the frames.
1. WINDOW REQUIREMENTS
• These instructions are for a standard double-hung
window. You will need to modify them for other
types of windows.
• The air conditioner can be installed without the
side curtain panels if needed to fit in a narrow
window. See the window opening dimensions.
• All supporting parts must be secured to firm
wood, masonry or metal.
• The electrical outlet must be within reach of the
power cord.
• Follow the dimensions in the table and
illustration for your model.
2. STORM WINDOW REQUIREMENTS
A storm window frame will not allow the air
conditioner to tilt toward the outside, and will keep
it from draining properly. To adjust for this, attach
a piece of wood to the sill.
WOOD PIECES
WIDTH: 2
Ǝ
LENGTH:
Long enough to fit inside the window
frame.
THICKNESS:
To determine the thickness, place
DSLHFHRIZRRGRQWKHVLOOWRPDNHLWƎKLJKHU
than the top of the storm window frame or the
vinyl frame.
Attach securely with nails or screws provided by
the installer.
A
(With side curtain panels)
B
ƎKLJKHU
than storm
window
frame
Storm window
frame
Wood
Sill
ƎKLJKHU
than vinyl frame
(on some windows)
9LQ\OIUDPH
Models
A
B
AHP08
´PLQ
´´
AHP10
´PLQ
´´
Cut and apply
weather strip to
front and bottom
edge of window
frame.
Cut and apply
weather strip to
back edge of
the window sill.
Cut and apply
a weather strip
to side of the
curtain frame
(one on each
side).
Top Mounting rail
Bottom mounting rail
Snap curtain
into frame