
3 Checkout Procedure
M1207026
3-11
3.7 Flush flow test
1.
Set the Bag/Vent switch to Vent.
2.
Attach a patient circuit and plug the patient port.
3.
If equipped, set the ACGO selector switch to Breathing System.
4.
Ensure that the bellows is completely collapsed.
5.
Measure the amount of time it takes to fill the bellows when the
O
2
flush button is fully and continuously depressed.
6.
Repeat the above measurement two more times (deflate bellows
by removing the plug from the patient port).
7.
The bellows should fill in approximately 3.0 seconds.
Possible Cause of
Failure
•
Large leak (if long filling time).
•
The output of the pressure regulator is incorrect.
•
The pressure regulator is incorrectly connected.
M1207027
004
MANUAL−DOC, Technical Reference Manual, Technical Reference Manual for 9100c, English−default
Reproduced from the electronic master in MATRIX