GE
LOGIQ F SERIES
D
IRECTION
5446617-100, R
EVISION
10
B
ASIC
S
ERVICE
M
ANUAL
3 - 10
Section 3-5 - Completing the Installation
3-5-2-1 Back-end Processor Power Down
2.) The System-Exit window is displayed.
Figure 3-5 System Exit Window
3.) Using the Trackball or Select
key, select Shutdown.
4.) The shutdown process takes a few seconds and is complete when the power status LED is turned
blue.
5.) Disconnect the probes. Clean or disinfect all probes as necessary. Store them in their shipping
cases to avoid damage.
3-5-2-2
Scanner Shutdown
Disconnect the Mains Power Cable if necessary.
For example:
Relocating the scanner.
3-5-3
Transducer Connection
1.) Plug the probe connector into the probe port, then lock the probe.
NOTE:
Please ensure that the probe latch is in an unlocked position before you connect the probe to the
system.
NOTE:
It is not necessary to turn OFF power to connect or disconnect a probe.
Summary of Contents for 5478035
Page 1: ...GE LOGIQ F Series Basic Service Manual Part Number 5446617 100 Revision 10 ...
Page 2: ......
Page 4: ...GE LOGIQ F SERIES DIRECTION 5446617 100 REVISION 10 BASIC SERVICE MANUAL ii ...
Page 5: ...GE LOGIQ F SERIES DIRECTION 5446617 100 REVISION 10 BASIC SERVICE MANUAL iii ...
Page 6: ...GE LOGIQ F SERIES DIRECTION 5446617 100 REVISION 10 BASIC SERVICE MANUAL iv ...
Page 7: ...GE LOGIQ F SERIES DIRECTION 5446617 100 REVISION 10 BASIC SERVICE MANUAL v ...
Page 8: ...GE LOGIQ F SERIES DIRECTION 5446617 100 REVISION 10 BASIC SERVICE MANUAL vi ...
Page 9: ...GE LOGIQ F SERIES DIRECTION 5446617 100 REVISION 10 BASIC SERVICE MANUAL vii ...
Page 10: ...GE LOGIQ F SERIES DIRECTION 5446617 100 REVISION 10 BASIC SERVICE MANUAL viii ...
Page 11: ...GE LOGIQ F SERIES DIRECTION 5446617 100 REVISION 10 BASIC SERVICE MANUAL ix ...
Page 12: ...GE LOGIQ F SERIES DIRECTION 5446617 100 REVISION 10 BASIC SERVICE MANUAL x ...
Page 14: ...GE LOGIQ F SERIES DIRECTION 5446617 100 REVISION 10 BASIC SERVICE MANUAL xii ...