Step 3: Complete the circuit to the load
1. Connect 120VAC Hot
(Black) of the LOAD to
Terminal 2.
2. Connect 120VAC
Neutral of the Load
(White) to terminal X.
3. Connect the bare wire
to the ground lug.
Tighten the screw
terminals to 25in-lb.
Improper tightening
can cause heating and
equipment failure.
Step 4: Reinstall the Plastic Guard
Install both screws with the plastic
guard facing the original position.
Removable Bridge