background image

 

OPM_MLE_LTE_350_1K0_1GB_V011

 

1

 

DE ML Series: user manual 1.1 (GB)

 

GE Digital Energy

 

ML Series

g

 

 

 

USER MANUAL 

 

Digital Energy

 

ML Series

 

Uninterruptible Power Supply

Uninterruptible Power Supply

Uninterruptible Power Supply

Uninterruptible Power Supply    

350

350

350

350----500

500

500

500----700

700

700

700----1000 VA

1000 VA

1000 VA

1000 VA    

 

 

Please read these instructions carefully before installation and start-up of the 

Digital 

Energy™ ML Series

 UPS. Keep this manual in a safe place for future reference. 

 

 

CONTENTS 

 

 1 

INTRODUCTION ........................................................................................... 2 

 1.1 

Introduction 

 

1.2 Safety Rules 

 

1.3 Transport / Storage 

 

 2 

INSTALLATION ............................................................................................. 2 

 

2.1 Installation Rules 

 

2.2 Installation Procedure 

 

 3 OPERATION.................................................................................................. 4 

 3.1 

Start-up 

 

3.1.1 Start-up, mains available 

 

3.1.2 Start-up, mains not available (‘battery start’) 

 

3.2 Use: Normal Operation 

 

3.2.1 Normal operating conditions 

 

3.2.2 Self test 

 

3.2.3 Auto-off (no-load shutdown) 

 

3.2.4 Switching off 

 

3.3 Use: Status and Alarm Indications 

 

3.3.1 Charger on 

 

3.3.2 Normal operation 

 

3.3.3 On battery 

 

3.3.4 Battery low 

 

3.3.5 Replace battery 

 3.3.6 

Overload 

 

3.3.7 Self test 

 

 4 

COMMUNICATION........................................................................................ 6 

 

 5 

MAINTENANCE............................................................................................. 7 

 5.1 

General 

 5.2 

Fuses 

 5.3 

Batteries 

 5.3.1 

General 

 

5.3.2 Battery replacement 

 

 6 

TROUBLESHOOTING .................................................................................. 8 

 

 7 

SPECIFICATIONS......................................................................................... 9 

 

©  

General Electric

. All rights reserved; reproduction without permission prohibited. This manual may be subject to change; no 

liability can be accepted for any error or omission.

 

GB 

Summary of Contents for 1000 VA

Page 1: ...000 VA Manufactured by GE Digital Energy General Electric Company Telephone 41 0 91 850 51 51 CH 6595 Riazzino Locarno Fax 41 0 91 850 51 44 Switzerland Website www gedigitalenergy com Technology for...

Page 2: ...ATION 2 2 1 Installation Rules 2 2 Installation Procedure 3 OPERATION 4 3 1 Start up 3 1 1 Start up mains available 3 1 2 Start up mains not available battery start 3 2 Use Normal Operation 3 2 1 Norm...

Page 3: ...lly Connect the unit to a wall outlet for a period of approx 48 hours minimum every 3 months The shipping box contains a Digital Energy ML Series UPS a power cord a computer interface cable a CD ROM a...

Page 4: ...he output cord provided connect the computer to the appliance outlets 3 of the unit 4 Connect the mains cord of the UPS to a working grounded AC wall socket outlet The green LED LINE will blink now ma...

Page 5: ...g mains is poor the AVR boosts a low incoming voltage or reduces a high one The load receives a voltage within the normal range see chapter 7 3 2 2 Self test UPS operation and battery condition In cas...

Page 6: ...ible Replace battery 3 3 5 Mains on UPS output on UPS has failed to pass the previous self test Green on mains mode Green blinking 1x sec standby mode Red blinking 1x 30 sec Beeps 1x 30 sec Overload o...

Page 7: ...ted power during battery operation the UPS output will be switched off immediately during mains operation the UPS output will be switched off after 30 seconds 3 3 7 Self test The self test can be star...

Page 8: ...ng the batteries use the same number and voltage V capacity Ah Proper disposal or recycling of the batteries is required Refer to your local codes for disposal requirements Never dispose of batteries...

Page 9: ...e above No communication between computer and UPS Computer interface problem Check interface cable and attached computer Blown input fuse See above UPS operates on battery though mains is present Very...

Page 10: ...r factor 0 6 0 7 at 90 load Transfer time ms typically 4 max 10 Buck Boost voltage regulation if the input voltage is within the input voltage window the output voltage varies between 198 265Vac Batte...

Reviews: