Abbreviated Installation Instructions
(For those who don't have time!)
S l i d i n g G a t e O p e r a t o r s
PLC 450, 630 Range
Made in Australia from Australian & quality imported components
MOVITRAC B
Place operator in correct position (Pinion wheel to be parallel to the
gate and stepped out to allow for width of rack once it is mounted
onto the gate frame). Mark out fixings and fix operator to the
concrete pad.
Fix rack to the gate frame keeping 1mm-2mm clearance between the
rack teeth and Pinion wheel
Once the rack is fixed move the gate and sight the rack moving over
the pinion wheel, check that most of the pinion wheel meshes with
the rack. Make sure rack runs freely over the pinion wheel, any
tights spots should be corrected by adjusting the rack height. Check
the operator is firmly bolted down to the concrete pad.
Ensure stops are installed on the gate for the fully closed and fully
open positions.
Connect Power supply (If not done already). Turn on
Power.
To commission the gate, move the gate approximately 1m from
the fully open position and tighten the knurled wheel
(Clockwise) engaging the clutch assembly
Summary of Contents for 450P I