GCL System Integration Technology Co., Ltd.
Bring Green Power to Life
19
MECHANICAL INSTALLATION
Mounting with Single-axis Tracking System
1.
This installation is only for 72 cells framed modules.
2.
It is a Single-axis Tracking System; the module is fixed on the axis by bolting long
frame.
3.
The frame of each module has 4-φ7*12mm mounting holes with specific location
shown in Figure 7.
4.
Secure the module in each fixing location with an M6 bolt, two flat washers, a spring
washer and nut as shown in Figure 7, torque: 9~12 N.m.
Figure 7