9/52
EN
•
Solder the copper pipe to the correct gas pipe (use cadmium-free silver
solder).
•
Make a pressure test of the connection.
•
Unscrew the connecting nut (10) and remove the tightening plug.
•
Mount the quick connection valve (6) after checking that the O-ring
is correctly positioned. Tighten by means of the special tool 325 197
290 and check during the tightening that the guide slot is positioned
upwards, corresponding to 12 on a clock face. (See sketch.)
•
Place the correct name plate (5) on the transparent cover plate (4) (the
screw holes shall be in horisontal position) and mount it with the two
screws (3). (Do not use too much force!)
•
Fasten the push plate (2) with circlip (1).
•
Test the function of the coupling by connecting a dosage device with a
male coupling. The coupling should only release its grip when the push
plate (2) is pressed inwards.
6.1.3. RECESSSED INSTALLATION MINI
1 2
3 4 5
6
7
8
9 10 11 12 13
14
CONDITIONS
•
The wall box and valve body are already carefully aligned and fixed in
the finished wall. The piece of copper tube in the valve body is brazed
to the proper service line and the joint is tested for leaks.
ASSEMBLY
•
Remove the protecting cover of the wall box (1) with a knife or screw
driver and unscrew the plug.
•
Insert the gasket (3), smoothly greased with silicon, into the valve
body(2).
•
Screw the maintenance valve into the valve body. Use tool 202 200 514
(torque 12 Nm).
•
Insert the O-ring (5) into the slot of the valve case (7), and screw the
coupling fully into the valve body (2).