![GBC 54C Installation & Operation Manual Download Page 27](http://html1.mh-extra.com/html/gbc/54c/54c_installation-and-operation-manual_3873898027.webp)
Page 6-3
SPIRE II Series
– Installation and Operating Instructions
4. Slide the roll of film onto the film shaft, ensuring
the adhesive does not make contact with the
roller.
5. Insert the film shaft back into the film shaft
Support Saddle.
6. Push the clevis pin through the holes in the
Support Saddle.
Figure 30. Shaft Clevis Pin in the Support Saddle.
7. Center each supply roll on the shafts using the
rulers on the shafts.
W
eBBInG
the
m
achIne
Prior to webbing the machine, ensure the supply
rolls are centered on the shafts. Also make sure to
remove all brake tension on the unwind and supply
shafts before you begin.
Caution:
Press
STOP
to ensure the machine is not
running.
Note:
The photos in this section are of a different
model SPIRE laminator. However, webbing the
machine is the same.
To web the machine:
1. Guide the top film under the Idler and back up to
the rewind tube.
Figure 31. Pulling pressure sensitive adhesive (PSA) film to
the Rewind Tube.
2. Fasten the center of the film to the to the rewind
tube with tape.
Figure 32. Taping film to the rewind tube.
3. Make two full wraps around the rewind tube.
4. Using a very sharp utility knife, lightly score the
laminating film without cutting the release liner.
Summary of Contents for 54C
Page 4: ...SPIRE II Series Installation and Operating Instructions Page iii...
Page 10: ...SPIRE II Series Installation and Operating Instructions Page 2 2...
Page 38: ...SPIRE II Series Installation and Operating Instructions Page 6 14...
Page 43: ...Page 7 5 SPIRE II Series Installation and Operating Instructions Notes Date Note...