background image

ZZZ-212.43200MR.0608-20.GP.EN.doc                                       WEB VERSION                                                                             10 

Before You Assemble the Gazebo 

 

Please don't destroy boxes until completely assembled. 

 

For future reference, take pictures of all six sides of each of the boxes upon receipt. 

 

Please verify the content of each box against the list of parts.  

 

It is important that this gazebo be anchored on a solid base with the provided screws. 
Otherwise, please ensure that you use anchors sufficient for your surface. 

 

The gazebo should not be installed adjacent to trees or a sloped roof. Snow and ice 
may slide onto the gazebo and cause it to collapse. 

 

Tools required (not provided)

  6ft (1.8m) Stepladder 

  Robinson #2 Screwdriver 

  Mallet 

  Safety Gloves & Glasses  

  Tarp or protective material for placing 

parts on during assembly 

  Tape Measure  

 

Leveling Shim

 

 

  
Step 1: 

 

1.  Assemble  B

eams  “A”  and  “B”  using  Center  Plate  “F”,  by  sliding  it  inside  the  beams  and 

securely tighten with 10 B

olts “Pp”.  

2.

 

Lay out the assembled Beams in a rectangle 

and join at each corner with a Corner Plate “E”, 

by sliding it inside the beams and tighten it with 4 

Bolts “Pp” tightly and hand fasten remaining 

4 Bolts. 

– see image on pg. 8

 

 

 

Summary of Contents for 43200MR-22

Page 1: ...DO NOT DESTROY THE BOXES UNTIL COMPLETELY ASSEMBLED FOR FUTURE REFERENCE TAKE PICTURES OF ALL SIX SIDES OF EACH OF THE BOXES UPON RECEIPT PLEASE VERIFY THE CONTENT OF EACH BOX AGAINST THE LIST OF PARTS Assembly with more than one person recommended Base Dimensions 8 9 x 8 9 Largest Dimensions 9 9 x 9 9 Overall Height 108 5 APPROX ...

Page 2: ...ucture or roof Before assembly read instructions and check that all parts are present in the boxes If any parts are missing refer to warranty information A 6ft 1 8m stepladder Phillips screwdriver tape measure level mallet and a tarp to place parts on will be required for assembly not included Remove top protective film from roof panels prior to assembly DO NOT remove bottom protective film until ...

Page 3: ...chaser with the bill In order to properly exercise your warranty please comply with the following Carefully inspect the contents of the carton for missing or damaged components Should you discover damaged or missing parts do not return the product to the place of purchase but contact Gazebo Penguin Customer Service Department at the numbers listed below Montreal 514 276 3485 Elsewhere 1 800 737 71...

Page 4: ...4 11 628 22 CORNER PLATE E 3 4 20 015 22 FINISHING BAR M 2 4 11 629 22 CENTER PLATE F 3 4 20 065 22 FINISHING BAR M2 2 4 11 630 22 81 LEG G 3 4 20 017 22 SOLIDIFYING BAR N 2 4 11 631 22 FOOT PLATE H 3 4 20 018 22 SOLIDIFYING BAR N1 2 4 11 632 22 CORNER COVER I 3 4 12 030 22 MOUNTING BRACKET O 2 4 11 633 22 MIDDLE COVER J 3 4 20 012 22 60 3 8 COVER ROOF BAR O1 2 4 19 101 22 TOP CAP K 2 1 20 011 22 ...

Page 5: ... 3 84 M4x16mm 17 053 22 FINISHING END Q1 2 4 08 167 22 SCREW Rr 3 12 M6x63 5mm 19 097 22 CORNER BRACKET Q2 2 4 08 193 22 PLASTIC PLUG Ss 3 12 20 071 22 55 LEFT FLASHING R 2 4 08 187 22 WASHER Tt 3 13 M6 11 642 22 47 CURTAIN RAIL 10 SIDE U 2 8 11 697 22 CURTAIN RAIL CAP Uu 3 8 20 007 22 RIGHT LOWER ROOF PANEL V 1 4 08 189 22 ACORN NUT Vv 3 1 20 008 22 LEFT LOWER ROOF PANEL V1 1 4 13 036 22 SCREEN M...

Page 6: ...ERSION 6 PART PACKED IN BOX QTY DIAGRAM PART PACKED IN BOX QTY DIAGRAM 16 118 22 SCREW M6 36 Oo1 3 36 NOT INCLUDED IN THE BOX DESCRIPTION COLOUR PART 11 705 22 CURTAIN HOOKS 3 80 SPRAY PAINT BROWN 11 726 PAINT PEN 18 184 08 182 10 mm KEY 3 1 ...

Page 7: ...ORNER PLATE E 3 4 20 015 32 FINISHING BAR M 2 4 11 629 32 CENTER PLATE F 3 4 20 065 32 FINISHING BAR M2 2 4 11 630 32 81 LEG G 3 4 20 017 32 SOLIDIFYING BAR N 2 4 11 631 32 FOOT PLATE H 3 4 20 018 32 SOLIDIFYING BAR N1 2 4 11 632 32 CORNER COVER I 3 4 12 030 32 MOUNTING BRACKET O 2 4 11 633 32 MIDDLE COVER J 3 4 20 012 32 60 3 8 COVER ROOF BAR O1 2 4 19 101 32 TOP CAP K 2 1 20 011 32 83 COVER ROOF...

Page 8: ... 3 84 M4x16mm 17 053 32 FINISHING END Q1 2 4 08 167 32 SCREW Rr 3 12 M6x63 5mm 19 097 32 CORNER BRACKET Q2 2 4 08 193 32 PLASTIC PLUG Ss 3 12 20 071 32 55 LEFT FLASHING R 2 4 08 187 32 WASHER Tt 3 13 M6 11 642 32 47 CURTAIN RAIL 10 SIDE U 2 8 11 697 32 CURTAIN RAIL CAP Uu 3 8 20 007 32 RIGHT LOWER ROOF PANEL V 1 4 08 189 32 ACORN NUT Vv 3 1 20 008 32 LEFT LOWER ROOF PANEL V1 1 4 13 036 32 SCREEN M...

Page 9: ...ERSION 9 PART PACKED IN BOX QTY DIAGRAM PART PACKED IN BOX QTY DIAGRAM 16 118 32 SCREW M6 36 Oo1 3 36 NOT INCLUDED IN THE BOX DESCRIPTION COLOUR PART 11 705 32 CURTAIN HOOKS 3 80 SPRAY PAINT SLATE 18 125 PAINT PEN 18 126 08 182 10 mm KEY 3 1 ...

Page 10: ...bo should not be installed adjacent to trees or a sloped roof Snow and ice may slide onto the gazebo and cause it to collapse Tools required not provided 6ft 1 8m Stepladder Robinson 2 Screwdriver Mallet Safety Gloves Glasses Tarp or protective material for placing parts on during assembly Tape Measure Leveling Shim Step 1 1 Assemble Beams A and B using Center Plate F by sliding it inside the beam...

Page 11: ...ZZZ 212 43200MR 0608 20 GP EN doc WEB VERSION 11 ...

Page 12: ...ep 2 1 For each Leg G attach Foot Plate H using 3 Bolts Pp Step 3 1 Unscrew 4 Pp Bolts as shown below have someone lift the Beam assembly and attach each Leg G into a Corner again securing each using 4 Bolts Pp 2 Repeat until all four Legs are in place ...

Page 13: ...Z 212 43200MR 0608 20 GP EN doc WEB VERSION 13 Step 4 1 Install Middle Cover J at each of the 4 beam junctions using 4 Screws Qq each 2 Install Corner Cover I at each of the corners using 4 Screws Qq each ...

Page 14: ...ttach Roof Rafters L1 L2 to the Central Hub L using Bolt Pp 3 Use Screws Qq to affix the Rafters L2 onto the top of the structure going through the Mounting Brackets P attached to the Rafters 4 Then use bolts Pp to affix the rafters L1 onto the top of the structure going through the Mounting Brackets O attached to the Rafters Note Rafters must be affixed where hole screws are closer to the center ...

Page 15: ...tep 6 1 Install the Flashings Q and R onto the Beam assembly using screws Qq on the inside The notched end of a Flashing will always go in a corner of the gazebo Step 7 1 Install the Curtain Rails T on the inside of the beam assembly using bolts Pp Pp ...

Page 16: ... one on top of the other 2 Place Finishing End Corner Bracket Q1 Q2 under the aligned holes and secure with Bolt Pp 3 Repeat process with all Finishing Bars as illustrated 4 In order to finish the installation of the last Finishing Bar M you have to unscrew the first Bolts Pp at your starting point and place Q1 or Q2 then re install the Bolt Pp ...

Page 17: ...200MR 0608 20 GP EN doc WEB VERSION 17 Step 9 1 From the inside of the solarium install the solidifying bar N N1 as illustrated using the bolts Pp 2 Each bolt Pp must be inserted into the inserts of the roof bars ...

Page 18: ...8 Step 10 1 Install the Bottom Roof Panels V V1 by sliding them onto finishing bar M M2 Step 11 1 Install first roof panel X1 by sliding it on top of roof rafters L1 L2 Note Roof Panel must be held in place until it is secured with the Cover Cap X1 ...

Page 19: ...nce the installation of the panel is complete install a cover roof bar O O1 onto the roof bar L1 L2 with the help of bolts Oo1 2 Place Cover Roof Bar on top of Rafter but do not completely screw it until both panels connected to the roof bar are placed L1 L2 Oo1 ...

Page 20: ... WEB VERSION 20 Step 13 1 Install the next upper roof panel X by sliding it on top of roof rafters L1 L2 then secure with mutual Cover Roof Bar 2 Continue to install the other panels one at the time until the last section X1 X TOP VIEW ...

Page 21: ...ZZZ 212 43200MR 0608 20 GP EN doc WEB VERSION 21 Step 14 Before installing last Roof Panel put Cap K on top of the Central Hub L ...

Page 22: ...ZZZ 212 43200MR 0608 20 GP EN doc WEB VERSION 22 Step 15 Install the last upper Roof Panel X1 X1 X X X1 X1 X1 X X ...

Page 23: ...ZZZ 212 43200MR 0608 20 GP EN doc WEB VERSION 23 Step 16 1 Once the last Roof Panel is installed screw last Cover Roof Bar O1 O2 to the Rafter L1 L2 with Bolts Oo1 L1 L2 Oo1 O1 O2 ...

Page 24: ...ZZZ 212 43200MR 0608 20 GP EN doc WEB VERSION 24 Step 17 Use Nut Vv to affix Top Cap K to the Central Hub L ...

Page 25: ...ded for harder surfaces Step 19 1 Install the Screen Curtains Ww in the interior groove of the Curtain Rails using the provided Hooks Install the Privacy Curtains Xx in the exterior groove of the Rails The curtains and screen panels facing diagonally to each other will be same 2 Once the hooks are in use curtain rail caps Uu to close ends of curtain rails ...

Page 26: ...ZZZ 212 43200MR 0608 20 GP EN doc WEB VERSION 26 NOTE The Dimensions Are Approximate ...

Reviews: