![Gateway EC14D Service Manual Download Page 48](http://html.mh-extra.com/html/gateway/ec14d/ec14d_service-manual_569699048.webp)
38
Chapter 3
General Information
Pre-disassembly Instructions
Before proceeding with the disassembly procedure, make sure that you do the following:
1.
Turn off the power to the system and all peripherals.
2.
Unplug the AC adapter and all power and signal cables from the system.
3.
Place the system on a flat, stable surface.
4.
Remove the battery pack.
Disassembly Process
The disassembly process is divided into the following stages:
•
External module disassembly
•
Main unit disassembly
•
LCD module disassembly
The flowcharts provided in the succeeding disassembly sections illustrate the entire disassembly sequence.
Observe the order of the sequence to avoid damage to any of the hardware components. For example, if you
want to remove the mainboard, you must first remove the keyboard, then disassemble the inside assembly
frame in that order.
Main Screw List
Screw
Quantity
Part Number
M2*3
30
86.WHA02.001
M2*4
6
86.WHA02.002
M2*6
14
86.WHA02.003
M2*10
6
86.WHA02.004
M3*3
4
86.WHA02.005
Summary of Contents for EC14D
Page 6: ...VI ...
Page 10: ...X Table of Contents ...
Page 45: ...Chapter 2 35 ...
Page 46: ...36 Chapter 2 ...
Page 81: ...Chapter 3 71 5 Lift out entire speaker module ...
Page 108: ...98 Chapter 3 5 Connect the thermal module cable to the mainboard ...
Page 111: ...Chapter 3 101 7 Replace the CRT cable 8 Connect the speaker and card reader board cables ...
Page 150: ...140 Chapter 4 ...
Page 156: ...146 Chapter 5 ...
Page 169: ...Chapter 6 159 ...
Page 178: ...168 Appendix C ...
Page 182: ...172 ...