
18
Chapter 2: Setup and Installation
www.gateway.com
From the rear of the rack cabinet, slide one of the mounting rails into
the slot provided on the left side of the enclosure.
Push the rail into the slot until it fits the depth of the rack cabinet.
It should mate with the rear rack cabinet vertical post.
Make sure that the enclosure is level. Do this by verifying that the
same height mounting location slots on both the front and rear rack
cabinet vertical post are being used.
d
Secure the left side rail to the vertical post using the screws and nuts.
e
Repeat the substeps 8(c) and 8(d) for the right side rail.
9
Re-install the power supplies. Do this by aligning the power supply with
its open bay and sliding the power supply in.
Make sure that the power supply completely seats in the enclosure. The
power supply will fit flush and the latch will reset as the power supply
reaches its fully seated position.
Rear Rack Vertical Post
Nut
Nut
Mounting
Screws
Rail Slot
Rail Slot
JP7
ADD
JU
MPE
R
TO D
ISA
BLE
TER
MIN
ATIO
N
ADD
JUM
PER
TO S
UPP
LY
TER
M P
OW
ER
JP6
JP5
CN
FG
1
CN
FG
2
RA
ID
SPA
RE
1
SPA
RE
2
BA
UD
SE
L
DLY
ST
RT
RM
T S
TR
T
JP8
ADD
JU
MPE
R
TO D
ISA
BLE
TER
MIN
ATIO
N
ADD
JU
MPE
R
TO S
UPP
LY
TER
M P
OW
ER
CHANNEL
-1
CHANNEL
-2
JP1
ADD JUMPER
TO
DISABLE
TERMINA
TION
ADD JUMPER
TO
SUPPL
Y
TERM POWER
JP3
JP2
JP4
JP1
ADD JUMPER
TO
DISABLE
TERMINA
TION
ADD JUMPER
TO
SUPPL
Y
TERM POWER
JP3
JP2
JP4
Controller 1
Controll
er 2
Summary of Contents for 850
Page 1: ...user sguide your Gateway 850 SCSI storage enclosure Installing Configuring...
Page 2: ......
Page 34: ...30 Chapter 2 Setup and Installation www gateway com...
Page 50: ...46 Chapter 3 Monitoring Systems www gateway com...
Page 64: ...60 Chapter 4 Troubleshooting www gateway com...
Page 76: ...72 Chapter 5 Maintenance www gateway com...
Page 77: ...A 73 Technical Information Specifications...
Page 84: ...80 Appendix C Safety Regulatory and Legal Information www gateway com...
Page 87: ......