32
GATES.COM
UNIPRESS 4 (UP4)
OPERATION MANUAL
5. WARNING
The following maintenance and inspection work must be carried out at the specified intervals. Any defects
found must be rectified or have them rectified.
5.1 SAFETY PRECAUTIONS
Carry out maintenance and repair work as well as troubleshooting only when the
machine is shut down.
Switch off the hydraulics and disconnect the power supply before starting
maintenance and repair work as well as troubleshooting. Secure the machine against
being switched on again.
Before starting maintenance work, carefully read all safety instructions contained in
this manual.
Have maintenance work carried out only by personnel authorized to do so.
Only carry out the maintenance and adjustment work listed in these instructions
yourself. If you need to carry out any other work, inform the customer service
department of PIPE BENDING SYSTEMS GmbH & Co. KG.
Only use spare parts that comply with the specifications of PIPE BENDING SYSTEMS
GmbH & Co. KG.
If necessary, secure the maintenance area over a wide area.
Reattach all safety devices after maintenance and repair work as well as
troubleshooting and check their function.
Retighten any screw connections that have been loosened during maintenance and
repair work or for troubleshooting.
After completing the maintenance work, remove the tools or repair materials from the
site of operation.
Summary of Contents for UNIPRESS 4
Page 1: ...OPERATION MANUAL UNIPRESS 4 UP4 GATES TUBE FITTINGS GMBH...
Page 37: ...37 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL 7 SPARE PARTS 7 1 HOUSING...
Page 40: ...40 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL 7 4 HYDRAULIC DRIVE...
Page 49: ...49 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL 8 APPENDIX 8 1 ELECTRIC CIRCUIT DIAGRAM...
Page 50: ...50 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL ELECTRIC CIRCUIT DIAGRAM...
Page 51: ...51 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL ELECTRIC CIRCUIT DIAGRAM...
Page 52: ...52 GATES COM UNIPRESS 4 UP4 OPERATION MANUAL 8 2 HYDRAULIC CIRCUIT DIAGRAM...
Page 53: ......