![Gate Motors MyGate myAster Series Installation Manual Download Page 8](http://html1.mh-extra.com/html/gate-motors/mygate-myaster-series/mygate-myaster-series_installation-manual_3727636008.webp)
REVISION 2019-2
GateMotors: +44 (0)1202 744958 • Technical support: +44 (0)1202 725489
www.gatemotors.co.uk • Sales and Accessories: +44 (0)1202 717191
• Insert the hexagonal release key (included in the fixing pack) and turn clockwise (pic O).
• The right hand motor will require an anti-clockwise turn (pic P)
• You will now be able to manually open and close your gate.
• If you wish to lock back your system, insert and turn the key in the oppostite direction.
• The gates can be at in any position – since after the first start command the system will return to its default settings.
Manual release
NB: Check the manual opening of the gate leaf before definitively fixing the
bracket
S3
to make sure the gate can open fully to your required angle.
To determine the position of bracket
S3
:
• Put the gate in the closed position.
• Manually release the motor (see below).
• Extend the ram to maximum opening.
• Push back the ram
20 mm
. This stops the motor from ‘leaping forward’ (pic K).
• Affix the bracket
S3
to the motor ram slot as illustrated (pic L). Place the pivot pin
PR1
into the locating hole (pic L).
• Secure the bracket
S3
to the gate leaf. Ensure the ram is perfectly straight. Use a spirit level for accuracy.
20 mm
Gate brackets S3
(pic K)
(pic L)
(pic O)
(pic P)
PR1
S3
Left motor
Right motor