Gate Motors Blank Installation And Use Manual Download Page 4

SAFETY CRITERIA

1

Attention

:  before  beginning  anykind  of  procedure  of  installation  is 

LOCKED ACTUATOR

absolutely necessary to read all this manuall.

The gear motor may with trasmission and drive lever be either locked.

2

Test/Control  that  the  perfornces  of  the  actuator  auswer  to  your  The electric lock must be installed on the wing that opens first and must be 

installation needs.

connected with the terminal board of the control unit.

3

Besides control that:

Position of the electric lock: (Fig. C).

• The gare hinges are in good conditions and perfectly fattened.

Position 1:

  Lock between the wings.

• The gate has mechanicall stops in the opening and the closing.

(in this case is necessary to use the bolt 

RT15

 on the second wing)

Position 2:

  Lock in the floor.

INSTALLATION ADVICE

(in this case the utilisation of the bolt is not essential)

Connections:

In any other case, we suggest the locked actuator. 

See the “

Operational Diagram

” and refer to the control central scheme.

In this case remenber to remove the lock or at least block the lock in opening 

The adjustment must be effected when the device has no power supply.

position and take away all the bolts of lock.

Foresee a omnipolar breaking device near to the apparatus (the contact 
must measure at least 3 mm). 

DETERMINATION OF FIXING MEASURES

Always protect the power supply using a 6A automatic switch, or a 16A  Following the instructions, choose the exact position of the gear motor 
single-phase switch fises.

paying attention to the structure and the opening you want. 

The power supply lines the motors, to the control unit and the connection 

GATE FIXED IN THE MIDDLE OF THE PILLAR (FIG. A)

lines  to  the  outfits  must  be  sepated  to  avoid  troubles  which  could  In this case the maximal  opening corner of the gate is 

90°

.

generate problems in the installation working.

GATE FIXED ON THE EDGE PILLAR (FIG. B)

Any outfits (of control or safety) eventually connected to the control unit  In this case the gate can open with a corner superior to 

90°

. (

max 110°

)

must be tension free.

Spare parts:

PROTECTION BOX (FIG. D)

 •

use esclusively original spare parts.

-

Make, in the established position, a digging on the ground which can 

Installation:

cobtain  the 

 Protection box

.

In order to correctly use the product and to exclude the possibility of   -

Put the 

Protection  box 

into  the digging. 

injury or damage, refer to the "

Generals

" page enclosure, which is an 

Make sure that the pin is aligned with the pivot of the leaf and that you 

integrated part of this manual.

have respected the distance of 65 mm between the centre of the pivot 

The use of this equipment must be in observance of the safety standards 

and the piller. (Fig. E)

in  force  in  the  country  where  it  is  installed,  as  well  as  the  standards  -

Make near the holes 

F1

 of the 

Protection box

 a discharge for the water 

governing proper installation.

in order to avoid a possible back water as well as an oxidation of the gear 

 

Warranty:

motor. (Fig. F)

The warranty supplied by the manufacturer becomes void in the event of  -

Notioe that the electrical cables have to go through the hole 

F2

 of the   

interference,  carelessness,  improper  use,  lightening  damage,  power 

Protection box

, as in the “

Functional scheme for swing gate

”. (Fig. N)

surges or use by unqualified personnel.

-

Make sure that the 

Protection box

 is perfectly horizontal and bury it with 

The  warranty  will  also  become  void  in  the  event  of  the  following:   

concrete.

Failure to observe the instructions given in the manuals supplied with the 
product. 

GEAR MOTOR

The application of any part in a manner differing from that provided for  -

Put the gear motor on the bottom of the 

Protection box

 and fasten it 

current legislation or the use of spare parts which are unsuitable and/or 

firmly to the tapping-screw with the right nuts M12. (Fig. F)

not approved by manifacturer.

-

Install the lever “

L1

” on the pin which comes out from the box. (Fig. G)

The  manufacturer  cannot  be  held  responsible  for  damages  due  to  -

Install the lever ”

L2

” lever of Transmission on the “

L1

” ( just installed). 

improper or unreasonable use.

(Fig. H)

-

Juin the lever “

L2

” to the lever “

L3

” (coming out from the gear motor) by 

INSTALLATION INSTRUCTION SEQUENCE

driving thepins into the right pivots and them with screws  

SPEI M6X18

1

Before  the  installation,  anomalyse  the  risks  referring  to  the  chapter 

(Fig. H)

Generalities

”  of  this  instructions  manual,  fill  the  technic  table  and  -

Closed the 

Protection box

, with the cover and fasten it with the right 

eliminate the risks a noticed. 

screw M6x18 

TPSCEI

.

In case of more risks, foresee the  installation with security system. 

-

Aligne both the leaf of the gate and the lever “

L1

” which comes out from 

2

Est the security laws of the “

Security Criteria

”.

the 

 Protection box

.  Fix them all with soldering.

3

Control all the components.

4

Decide the position where you want to install the gear motor.

MECHANICAL STOP

5

After  deciding  the  right  position  tou  have  to  make  a  digging  on  the  Now it is necessary to put the locks in order to make the openin and in the 
Ground. 

closing of the swing. 

6

Install the 

Protection box

  in the  digging on  the  Ground.

7

Foresee a discharge for the water.

GATE WITH EXTERNAL OPENING

8

Connect the Electrical cables as in the 

“Operational Diagram”

If the gate has an external opening it is possible to put the motor in to the 

9

Put the gear motor on the botton of the Box and fasten it firmly inside the  Protection box  moving it of 

180°

.

protection.

10

Install the levers for the gate movement

MOTOR RELEASE

11

Close the 

Protection box

.

-

Turn off the electricity.

12

Aligne and fix the leaf of the gate.

-

Put the release key in the correct hole on the release lever and turn the left 

13

Connect the central and all the accessoires

clockwise, whereas the right leaf in the other direction.

14

Program the radio receptor

In this way you will release the transmission. (Fig. I) 

15

Pèrogram working times

Take out the key and do the emergency manouvre.

In case of badworking, see the “

Anomalies and Counsuls

-

Now it is possible to open and to close the gate handly.

IF YOU DO NOT FIND ANY SLUTION COLL THE NEATEST ASSISTENCE  -

In order to re-estabilish the transmission, you have to put the leaf in the 

CENTRE.

starting position (the clutch is auomatic).

-

Re-estabilish the power supply.

DEVICE 180° (A 008)

The device  has been applied to particular cases, to allow openings util 

180°

.

For  a  correct  installation  of  the  device 

180°

,  fallow  carefully  these 

instructions:
-

Find out the pinion 

P1

 on the gear motor. (Fig. L)

-

Mount the lever with pinion 

P2

 on the pin which comes out from the box.

-

put the transmission key “

C

” on the spur wheel, stretch it and fasten it.

-

Grease the chain. Close the box with the cover and fix it with suitable 
screws 

M6x18 TPSCEI

.

-

Aligne both the leaf of the gate and the lever 

L1 

which comes out from the 

box. Fix them all with soldering.

-

Repeat the same operation with the other leaf.

Reviews: