Caution: The device must be grounded.
Figure 7
The supply cable and voltage must be checked by the authorized staff, the power of wall hung boiler must be
measured and compared to the figures specified on the technical label of the wall hung boiler and they must
be equal. The cable must be appropriate for the power of wall hung boiler.
NOTE: The manufacturer company is not liable for the damages and failures caused by
3 FILLING THE WATER FOR CENTRAL HEATING SYSTEM
After connecting electricity, gas and water connections, start filling the water for central heating
system and circuit. This procedure must be performed with care.
3.1 Filling Operation for Baykan Sun Model
!
Press “A” switch for running your wall hung boil (Figure13), the water pressure of central
heating system will be displayed on the screen.
!
Turn the radiator inlet valves to on position, ensure that the air discharge cocks are open.
!
Slowly turn the filling valve on. (Fig. 8), turn the water pressure to 1,5-2 bars.
!
Turn off the air cocks on the radiators immediately as the water comes..
!
14