By rotating the “A” switch seen on Figure 13-14 upon 

"

 

symbol (sun), select the 

summer mode or and if you have the version having a display screen, pres 

“D” 

switch 

seen on figure 15 and pres it until

"

symbol is displayed. 

 

 

After loosing the screw, place a mini manometer sinker on pressure socket 1 (figure 

nr. 17). Later, turn the water tap at full capacity and wait for 10 seconds and check if the 
maximum value reaches the figure specified in the table for GAS PRESSURES WHILE 
OPERATING. 

 

 

Disconnect the connector of gas valve modulator and wait for the flame descend, after 

this, check the minimum value of gas pressure.  

 

 

When the wall hung boiler is on, open it by turning the hot water tap to the last. 

 

 

MAXIMUM CAPACITY: Pull the protective cap on the armature of the gas valve (Figure 

nr. 18) symbolized by “C”, tighten up the screw shown by “A” on nut “B”, thus adjust the 
maximum pressure, (for increasing the pressure, rotate it clockwise, for decreasing the 
pressure rotate it counter clockwise). 

 

 

MINIMUM CAPACITY: Disconnect a connector of gas valve modulator, meanwhile hold 

the nut shown with “B” still, adjust the minimum pressure by tightening the screw “A” (for 
increasing the pressure, rotate clockwise, for decreasing the pressure rotate it counter 
clockwise.). 

 

 

Install the supply connector back to its place and check if the figures you have set up 

are correct. 

2.ADJUSTING THE HEATING TO ITS MAXIMUM LEVEL (TRIMMER P2/R12 SETUP PAGE 02) 

The maximum capacity of heating is adjusted on the basis of the installation requirement determined by the 

project, for adjustment you have follow the procedures below.l 

For Baykan sun (version with with Lcd display screen) (Menu/setup) 

 

 

Turn the wall mounted boiler on and select winter mode by the switch symbolized with 

letter 

“D” 

, when you select this mode,

#

symbol will glow. (snowberry). 

 

 

Turn the boiler on and measure the gas pressure by means of a manometer. 

 

 

Hold down 

“F” 

switch (Figure nr. 15) for 10 seconds, the menu set up will appear. 

 

 

By moving “

B

” switch, display the 

P02 

page of set up menu on display screen 1. 

 

 

Enter the maximum capacity value by moving switch “

C

” (Specified interval 0– 99) 

Display number 2. 

!

 

16

Summary of Contents for BAYKAN 24kW Sun Premix

Page 1: ...mix 30kW Sun Premix 35kW Sun Premix Our highly esteemed customers We would like to thank you for your trust in our company Baykan and your decision for purchasing products of Baykan Our devices have been manufactured with the latest technology and they offer you the best comfort of use and heating 1 ...

Page 2: ...CONTENTS 1 WARNINGS PAGE 3 2 TECHNICAL DATA PAGE 6 3 INSTALLING PAGE 8 4 ADJUSTMENT AND MAINTENANCE PAGE 15 5 USAGE PAGE 19 2 ...

Page 3: ... Bayklan Main Service Headquarters and Baykan Authorized Technical Services provide the installation adjustment and maintenance works of your wall hung boilers Your boiler has been manufactured for purpose of supplying for the closed circuit heating installation and providing hot domestic potable water Attention must be paid for these points Install your wall hung boiler tıo the wall at a location...

Page 4: ...h operate using electricity and gas Open the windows and doors Do not touch the electricity switches Do not smoke Immediately inform the Authorized Institution Your Local Gas Distribution Company and authorized people Baykan Main Service Headquarters and Authorized Technical Service Gas Emergency Line 187 Explosive and Flammable Materials Do not use explosive and flammable materials close to the l...

Page 5: ...h International Directives and Regulations Your device is certified by Turkish Standarts Institute TSI Certificate Number Your device is CE certified CE Certificate Number The device is in conformity with the directive numbered 92 42 EEC on Liquid and Gas burning devices The device is in conformity with the directive numbered 90 396 EEC on Gas burning devices The device is in conformity with the d...

Page 6: ... temperature G20 20mbar 105 1 105 7 105 5 Class 107 2 107 5 107 5 Nox Type C 53 4 48 2 49 1 CENTRAL HEATING Central Heating System Water Temperatu Expansion Tax Capacity C 30 80 Expansion Tank Pressure lt 6 0 8 0 8 0 Central Heating Water Pressure Bar 1 0 Max cent Heating sys water temperature Bar 3 0 DOMESTIC HOT WATER CIRCUIT Domestic hot water production lt dak 13 6 17 0 20 0 Domestic hot water...

Page 7: ...NECTIONS Width mm 400 Height mm 700 Depth mm 330 362 394 Weight kg 37 39 41 CH circuit inlet outlet inç DHW inlet outlet mm 60 100 Gas circuit m 90 Dirsek 3 5 Flue pipe diameter m 90 Dirsek 0 5 Flue pipe length min max mm 80 80 Min Max Parallel Pipe Lenght m 1 00 mbar a eşdeğer Min Max Parallel Pipe Lenght m 0 5 0 5 90 Dirsek Gas circuit G20 mbar 20 G30 31 mbar 29 37 7 ...

Page 8: ...in the building The waste gases that form due to combustion in wall hung boilers are exhausted by means of the flue duct Since the use of such devices at areas with air inlets and flue ducts not conforming the specifications are dangerous for human life the Gas Company does not permit the use of gas 1 Air Pressure Switch 2 Het Exchanger 3 İonization electrod 4 Condensate output 5 Fan 6 Motorized 3...

Page 9: ...ust not be mounted to areas with less than 8 m3 of volume and bedrooms balcony dusty environments stairwells and random empty areas in the building The waste gases that form due to combustion in wall hung boilers are exhausted by means of the flue duct Since the use of such devices at areas with air inlets and flue ducts not conforming the specifications are dangerous for human life the Gas Compan...

Page 10: ...e said spaces can be provided by keeping a wide space between door and floor EXAMPLEINDIRECT NATURAL VENTILATION EXAMPLE FOR AIR CIRCULATION THAT ARISES DUE TO THE DIFFERENCE OF DENSITY If air flow is insufficient the combustion air may be supplied by an orifice from one or more rooms nearby the installing room by air orifices as seen in the figure 1 2 Hermetic C Type Wall Hung Boiler Placement BA...

Page 11: ...asurements given in the figure Hang your wall hung boiler to hanging screws 2 2 WATER AND GAS CONNECTIONS Before starting the procedures related with water connections we recommend you to wash the installation in order to get rid of the particles that may be present in pipes and radiators Connect the water and gas according to the positions shown in the figure Connect the outlet of safety valve to...

Page 12: ...nsure that the Gas pipe is clean clean around it The building internal gas distribution pipe must conform to the technical specifications and regulations An elastic connection between the device and internal gas line of the building must be made 3 4 12 ...

Page 13: ...not liable for the damages which may arise due to non standard electricity connection and grounding maps As electricity cables use NYM 3x1 5 mm2 Phase Neutral soiling Use a 3 Amper fuse CAUTION CONNECT YOUR DEVICE TO BIPOLAR SOCKETS Do not operate your device with multiple sockets and adapters If the electricity cables need to be replaced the cables having the same properties and specifications mu...

Page 14: ...LLING THE WATER FOR CENTRAL HEATING SYSTEM After connecting electricity gas and water connections start filling the water for central heating system and circuit This procedure must be performed with care 3 1 Filling Operation for Baykan Sun Model Press A switch for running your wall hung boil Figure13 the water pressure of central heating system will be displayed on the screen Turn the radiator in...

Page 15: ...n the label ADJUSTMENT AND MAINTENANCE 1 ADJUSTMENTS CAUTION ALL PROCEDURES AND OPERATIONS DEFINED IN THIS SECTION OF THE MANUAL MUST BE PERFORMED BY QUALIFIED PROFESSIONALS APPARATUS ADJUSTMENT In order to enable the access to the adjustment apparatus the front panel in front of the wall hung boiler must be dismantled In order to achieve this two screws at the bottom of front section must be take...

Page 16: ...ounter clockwise MINIMUM CAPACITY Disconnect a connector of gas valve modulator meanwhile hold the nut shown with B still adjust the minimum pressure by tightening the screw A for increasing the pressure rotate clockwise for decreasing the pressure rotate it counter clockwise Install the supply connector back to its place and check if the figures you have set up are correct 2 ADJUSTING THE HEATING...

Page 17: ...tion on the process card between 1 2 LPG circuits see figure nr 5 Ensure that the pressure on the boiler is min 25 and max 35 bars for butane gas and min 25 to max 37 mbar for Propane furthermore you should also be aware of and check gas leakages Readjust the heating capacity set up by means of the tap water maximum and minimum capacity set up and do not forget that the maximum pressure value shal...

Page 18: ...ubstances that form due to burning MAINTENANCE WORKS Cleaning the growing coverings that may form on exchangers and electrodes Getting rid of the oxidation that may form on boiler Opening the device turning it off and checking its operation efficiency Checking for the leaks from sleeves pipes and gas and water connections Checking the operation and performance of safety components Checking the pro...

Page 19: ...ust be performed by qualified professionals The said person must check that the data on the plate and all adjustment elements and set ups are in conformity with the specified use of the device Always check that the pipes for the discharge of wastes caused due to combustion function weel and always check if they are properly closed Always be sure that the air flow at the locations and areas where t...

Page 20: ...or a long period of time turn off the main gas supply tap and cut the electricity leading to the wall hung boiler The wall hung boiler is controlled by a device against freezing on its control card the mentioned function activates when the water temperature inside the installation goes below five degrees however the wall hung boiler must be connected to electricity for that As the water temperatur...

Reviews: