8
Do
not
modify
the
ventilation
openings,
ventilation ducts, ventilation vents and do not
block them after the commissioning.
Never use the boiler in places where excessive
amounts of dust are stored, where barber shops,
corrosive, explosive chemicals are stored or used.
If the boiler receives the combustion air from the
environment, there should not be any low
pressure due to other systems / boilers in the
boiler room.
If the boiler will operate with LPG, electrical
equipments must be at least 500 mm above from
the floor.
The boiler must be installed in accordance with
the electrical voltages, gas and water pressures
specified in the technical table.
Grounding of the electrical line is mandatory.
Never switch off the mains when the boiler is in
operation. Such behavior may cause abnormal
heat build-up and damage the heat exchanger and
other units of the system.
2.4
WARNING LABEL
WARNINGS !
Read the technical instructions and user
manual carefully before the commissioning.
Commissioning must be made by an
authorized Gassero service.
The boiler must be located in a location
that is separate from the living quarters and
only in accordance with the ventilation
legislation.
WALLCON X-treme 115-125-150