7
6
Heater positioning
1. Position heater at least 200mm from the eave
lining or ceiling.
2. Position heater at least 1.8m above the floor.
3. Never position in front, above or below a
power point.
4. If heater is facing another vertical surface,
example – wall, the gap must be at least 1
metre.
5. Never mount heater within 1 metre of a water
source, example – tap.
6. Never mount heater into the wall or ceiling.
Only mount to the surface.
eave/ceiling
floor
1.8 m
w
all
eave/ceiling
minimum 1.8m
w
all
200mm
90°
1m minimum
200mm
floor
w
all
heater
No
eave/ceiling
heater
1.8m minimum
No