LB Meter settings are shown in cases with DLM meter adress 100
or 101 installations
A.
Currentlimited (A): Set Distribution board fuse size.
B.
In systems where Power-limit is neccessary, tick the box
and set the Powerlimit value wanted in the distribution
board.
Note, it is possible to monitor 2pcs distribution boards. In
this case, settings needs to be done for each DLM meter.
The wallbox needs around 5min to detect an installed
DLM meter after power on.
C.
Choose correct system for your installation.