E F A P O W E R E V - Q C 4 5 S T A N D A L O N E - I N S T A L L A T I O N A N D U S E R M A N U A L
16/32
6 START-UP
6.1 VERIFICATION AND INSPECTION
Check
if
the
bolts
of the AC and
protective
ground
cables of the Quick Charging Station are correctly
tightened
to the
specified
torq ue
Check
the
resistance
betw een
the
Quick
Charger
protective
ground
and
the
low
voltage
sw itchboard
ground
connection; the
value
must be
according
to
local
codes
Before switching ON all the fuses and circuit breakers,
check
the
supply
voltage
between lines: it must be
400V ± 10% 50Hz
, for
CE
marked
Units (and
480V ± 10% 60Hz
for
ETL
marked
Units)
At this stage,
w henever
the
Unit shall be integrated
with
a
N
etwork
M
anagement
S
ystem,
Efacec
shall
already
have
the
follow ing
information
:
For
Unit configuration
:
Station
(s)
ID
and Central Management
Endpoint
For
Router configuration
:
APN
and
PIN
,
Username
and
Passw ord
(if applicable)
6.2 SWITCH ON
BEFORE ATTEMPTING TO INSTALL OR START UP THE EFAPOWER EV QC45 QUICK
CHARGING STATION THE USER MUST ENSURE THAT THE SAFETY INSTRUCTIONS
IN THIS MANUAL ARE CAREFULLY READ AND OBSERVED BY TECHNICALLY
COMPETENT PERSONNEL.
KEEP THIS MANUAL WITH THE EFAPOWER EV QC45 QUICK CHARGING STATION
FOR FUTURE REFERENCE.
THIS EFAPOWER EV QC45 QUICK CHARGING STATION MUST NOT BE STARTED OR
PUT INTO USE WITHOUT HAVING BEEN COMMISSIONED BY A FULLY TRAINED
AND AUTHORIZED PERSON.
ALL SERVICING MUST BE PERFORMED ONLY BY QUALIFIED PERSONNEL. DO NOT
ATTEMPT TO SERVICE THE EFAPOWER EV QC45 QUICK CHARGING STATION
YOURSELF.
BY OPENING THE DOOR OR REMOVING THE EFAPOWER EV QC45 QUICK
CHARGING STATION SIDE PANELS YOU RUN THE RISK OF EXPOSURE TO
DANGEROUS VOLTAGES!
IN CASE OF ANY KIND OF DOUBT REGARDING THIS, PLEASE CONTACT:
EFACEC WILL ASSUME NEITHER RESPONSIBILITY NOR LIABILITY DUE TO
INCORRECT OPERATION OR MANIPULATION OF THE EFAPOWER EV QC45 QUICK
CHARGING STATION.
EFACEC HAS TAKEN EVERY PRECAUTION TO PRODUCE AN ACCURATE, COMPLETE
AND EASY TO UNDERSTAND MANUAL AND WILL THEREFORE ASSUME NO
RESPONSIBILITY NOR LIABILITY FOR DIRECT, INDIRECT OR ACCIDENTAL
PERSONAL OR MATERIAL DAMAGE DUE TO ANY MISINTERPRETATION OR
UNDESIRED MISTAKES IN THIS MANUAL.
THIS MANUAL MAY NOT BE COPIED NOR REPRODUCED WITHOUT PRIOR
WRITTEN PERMISSION OF EFACEC
At this stage,
w henever
the
Unit shall be integrated
with a
N
etwork
M
anagement
S
ystem,
Efacec shall
already have
the
follow ing information
:
For
Unit configuration
:
Station
(s)
ID
and Central Management
Endpoint
For
Router configuration
:
APN
and
PIN
,
Username
and
Passw ord
(if applicable)
Electronic Power Systems Unit
Rua Eng.º Frederico Ulrich - Apartado 3078
4471-907 MOREIRA MAIA - PORTUGAL
Tel: (+351) 229432248 - Fax: (+351) 229403209
www.efacec.com
Electronic Power Systems Unit
2725 Northwoods Parkway, Ste. B
Norcross, Georgia 30071 USA
Tel: (1) 470 395-3648
-
Fax: (1) 770 446 8920
www.efacecusa.com
Summary of Contents for QC45
Page 2: ...Installations och anv ndarmanual...
Page 37: ...Installation and User Manual...
Page 71: ...Installasjons og brukerh ndbok...
Page 105: ...Asennus ja k ytt opas...