background image

• Component Overview    

 

◦ Interior Bottom................................ 

◦ Interior Lower Middle.....................

◦ Interior Upper Middle..................... 

◦ Interior Top......................................

• Connecting the Power........................

• Accessing the Web-Interface.............

• Adding the RFID cards........................

• Setting DLM + External Meter............

◦ Explanation of DLM Parameters....

◦ Setting up External Meter............... 

◦ Setting up DLM Slaves....................

• Schematic for looped chargers..........

• Schematic for individual chargers.....

Contents

2

3

3

4

5

7

8

9

10

12

13

14

Summary of Contents for LS4 Wallmounted

Page 1: ...LS4 GLB Operational Instructions...

Page 2: ...or Top Connecting the Power Accessing the Web Interface Adding the RFID cards Setting DLM External Meter Explanation of DLM Parameters Setting up External Meter Setting up DLM Slaves Schematic for loo...

Page 3: ...Interior Bottom Interior Lower Middle 2...

Page 4: ...3 Interior Upper Middle Interior Top...

Page 5: ...4 Connecting the Laptop computer...

Page 6: ...ss field type in 192 168 123 123 operator and press ENTER to navi gate to the web interface startup page where you get to choose which controller master or slave you want to connect to Access to the c...

Page 7: ...ters from the Settings view and also more advanced settings when it comes to connectivity communication monitoring authentication and behavior during operation Operator demands operator or manufacture...

Page 8: ...croll down to Free Charging approx half way Select if in doubt allow charging select ON Select SAVE on Laptop Plug in CAR or TEST Equipment to master socket LHS Activate CP Button Place new RFID card...

Page 9: ...8 Setup of DLM with external Secondary Meter...

Page 10: ...charging equipment connected to it 0 Shows which ID could be any between 0 255 The DLM Slaves will use this ID to find their specific Master FIFO First In First Out The only available Algorithm in 4...

Page 11: ...use of the entire premise build ing area grid 9999 9999 9999 In case of a disconnection from the external meter the DLM Master will assume this is the load that is being drawn from the meter A high va...

Page 12: ...Meter configuration Second Phase rotation of the ChargePoint Model of the external meter This meter should be addressed 2 and be connected to the DLM masters meter bus RST L1 L2 L3 Standard Reference...

Page 13: ...ific Master 6 The minimum current the chargepoint need to start charging a car 6 The maximum current the DLM Slave will be allowed to use if disconnected from the DLM Master If disconnected the DLM Ma...

Page 14: ...13...

Page 15: ...14...

Reviews: