GARO LS4 43kW Installation Manual Download Page 9

Connect the charging cable to the EV.  
If authorization is activated, please hold a valid RFID-tag against the RFID reader on the side of the LS4 you want to use or use the 
operator app to authorize charging. 
Charging will start instant if the EV is ready for charging. See your EV charging manual.
When finishing charging, follow the EV’s instructions. 
After charging: Release the charging cable from your EV and place the charging cable at designated place. 

Firm

No car connected

Charging station available and ready for charging

Car connected

State B: Car connected but not yet ready for charging

Car connected

State C: Car connected and ready for charging, but charging 
station requires authentication to start charging (Free Charging = 
"OFF").

Blinking (3 blinks)

When car connects

The charging station detects that the cable is connected, but is 
yet to detect the car.

Blinking (30 

second blink)

Whenever during operation

Charging station have received command from backend to start 
charging and is waiting for car to connect.

Firm

Car connected

Charging is ongoing (state C)

Car connected

Charging is paused (state B)

Blinking

Whenever during operation

Charging station/point is reserved for a specific user

Firm

Whenever during operation

DC fault monitor may be defect.

Whenever during charging

Residual Circuit Current Breaker (RCCB) triggered.

Whenever during charging

DC fault detected.

Whenever during charging

Circuit breaker (MCB) triggered - Overload / short circuit

Whenever during charging

Type 2 connector motor locking was released/unlocked (the 
cable can be removed)

When connecting car

The socket outlet can not engage locking mechanism to lock the 
connector.

When connecting car

Charging cable is damaged.

Firm (3 seconds)

When RFID is presented

RFID card is not valid or not approved by backend.

Blinking

Whenever during operation

Charging station/point is deactivated. 

Blinking

When RFID is presented

Charging station is verifying the RFID in backend cloud service.

LED light indication When

Cause of error

USER INSTRUCTIONS

NORMAL USE

9

EN

Summary of Contents for LS4 43kW

Page 1: ...GARO LS4 43kW Installation Manual EN GARO AB Box 203 SE 335 25 Gnosj Phone 46 0 370 33 28 00 info garo se garo se Manual 380316 1 0 EN...

Page 2: ...utions 4 General Information 4 Content 4 INSTALLATION 5 NORMAL USE 9 Electrical diagram 14 Technical specifications 17 Service information 17 Form for annual service and maintenance 18 Warranty Condit...

Page 3: ...FETY INFORMATION The LS4 stations are designed exclusively for charging electric vehicles All installation must be carried out by an authorized installer and comply with local country installation reg...

Page 4: ...er behind the front door When contacting GARO support please have the M number available LS4 stations that are pre configurated for backend solution have the ChargeBoxID CBID labeled under the M numbe...

Page 5: ...the provided ethernet router switch located ie in the LS4 master Se example of ethernet wiring diagram picture 6 7 In cases with LS4 stations connected in a grid installation of the LS4 stations need...

Page 6: ...picture 1 picture 2 Cu 2 5Nm Al 4Nm OPTION INSTALLATION CU AL 6 EN...

Page 7: ...0 8Nm 0 05 picture 3 picture 4 picture 5 INSTALLATION 7 EN...

Page 8: ...P CAT6 cable to router switch 5pcs LS4 connected with TP CAT6 cable to router switch picture 6 picture 7 Example of DLM meter installation Modbus address 2 9600 8 1 no parity Terminals 200 A 201 B DLM...

Page 9: ...ing station have received command from backend to start charging and is waiting for car to connect Firm Car connected Charging is ongoing state C Car connected Charging is paused state B Blinking When...

Page 10: ...g without success Contact installer or GARO Support please have M number available Check car settings that can influence charging i e gear in parking mode doors closed car locked etc Present a valid R...

Page 11: ...kend charger configuration OperatorCurrentLimit Check motor locking wiring and connection for damages Verify that locking mechanism rod and arm are not stuck Verify that the connector is properly inse...

Page 12: ...black cables were disconnected then it has deteced an earth fault in one of the DC powered components controllers upper PCB router switch etc inside the charging station If LED light DC OK remains tu...

Page 13: ...Vehicle not connected Firm CHARGING occupied C Vehicle connected ready CHARGING suspendedEV B Vehicle connected not ready Blinking Reserved Firm RCD triggered groundFailure Residual current detected...

Page 14: ...XN1 Neutral Terminal Block QA1 Contactor XPE1 Protection Earth Terminal Block 1 XPE2 Protection Earth Terminal Block 2 CT1 Current transformer 100A CT2 Current transformer 100A CT3 Current transforme...

Page 15: ...CT3 XPE2 XPE1 P1 CC1 A MOD CC1 B MOD AC Terminal 35 Feritte 525 Ohm DOUBLE INSULATED CABLE 16 1 5 XN1 L N EB1 Heater Cold Option 10A FC3 I 2 1 P1 11 P1 11 XD1 CP 201 200 External Energy Meter A1 A2 Q...

Page 16: ...o t o M Motor HS1 Relais 13 Motor HS2 Relais 14 GND2 Modbus B2 Modbus A2 Modbus WA Relais 23 WA Relais 24 RJ45 CC1 Down Side 0V 12V DC Terminal A1 A2 K3 OUT IN OUT IN CC RFID 12V GND HEAT Top Card KF1...

Page 17: ...ID output power 250mW SERVICE INFORMATION Care and maintenance GARO charging station LS4 The warranty will only remain valid if service is performed Service is performed once a year and must be docume...

Page 18: ...cation by 2 or 3 flashes from LED s Turn off the electrical power Check gaskets Check torque for mains terminals Check torque for LS4 fixing screws towards ground wall Check torque on standard compone...

Page 19: ...l number 7 Warranty does not cover damage occurred by incorrect use of equipment use of any non original spare parts lack of maintenance or faults caused by disassembly of the product or unauthorized...

Page 20: ...ANTIFORMUL R LS4 Model M no Electrical installation data Group fuse A Supply cable dimension Function Test Testbox EV model Date Sign Installer Company Name Owner Customer Name Installation adress WAR...

Page 21: ...DECLARATION OF CONFORMITY 21 EN...

Page 22: ...GARO AB Box 203 SE 335 25 Gnosj Phone 46 0 370 33 28 00 info garo se garo se EN...

Reviews: