INSTALLATION OF STANDALONE GTB WALLBOX
(table 1)
GTB 3,7 kW = 16 A
GTB 7,4 kW = 32 A
GTB 11 kW = 32 A
GTB 22 kW = 63 A
INSTALLATION OF STANDALONE GTB WALLBOX
(picture 1)
(For installation of GLB in cluster, see User manual at www.
garoemobility.com/support)
• The installation must be performed by a professional
electrician. The installed mains cable need to handle up to
63A during long term period. Calculate the required cable
length and select the appropriate cable-area to minimize the
risk of voltage-drop.
• Follow local country regulations.
• Left hand side PCB (CC1) controls the left side outlet/cable
and the right hand side PCB (CC2) controls the right hand
side outlet/cable.
1. Select the appropriate group fuse and cable size for the
electrical installation.
When the GTB twinbox uses max rated power, the consumed
electrical current = table 1.
NOTE! Due to high currents for a long time in the cable, there is a
high risk of voltage drop if the cable is under-dimensioned which
can damage the electronics in an EV.
2. Fill in the information in the Warranty form.
3. Mount the GTB Twinbox on a wall/pole according to the
installation sketches, (picture 1-6)
(picture 2)
MAX Ampere per modell
6 Ø 8,5mm (screws not included)
4x M8 L20mm
5
EN