background image

Part # 4525958 (10/28/08)

Page 8

INSTALLATION continued

Gas Supply

A .  The type of gas for which the unit is equipped is stamped 

on the rating plate . Connect a unit stamped “NAT” only 

to natural gas; connect those stamped “PRO” only to 

propane gas .

B .  If it is a new installation, have gas authorities check meter 

size and piping to assure that the unit is supplied with 

sufficient amount of gas pressure required to operate the 

unit .

C .  If it is additional equipment or replacement, have a 

qualified gas technician check the gas pressure to make 

certain that existing gas facilities (meter, piping, etc .) will 

deliver the BTU’S of gas required at the unit with no more 

than 1/2” water column pressure drop . When checking 

pressure, be certain that other equipment on the same 

gas line is on at full rate .

NOTE:  When checking pressure, be sure that all other 

equipment on the same gas line is on . If the broiler has 

been supplied with a regulator it has been preset to 

match specifications on the unit’s rating plate . All units 

require regulators and should be adjusted accordingly to 

manufacturer specifications

D .  The appliance and its individual shut off (supplied by 

others) must be disconnected from the gas supply piping 

system during any pressure testing of that system at 

pressures in excess of 1/2 PSI (3 .45 KPa) .

E .  Gas supply connection is made in back lower left hand 

corner of unit . A readily accessible approved type of hand 

valve should be installed on each supply line . Test for 

leaks – Do Not Use An Open Flame .

F .  A pressure tap plug is supplied with the units and it 

is installed on the manifold . The valve panel must be 

removed to use the pressure tap . The gas pressure must 

be checked when the unit is installed, to insure that the 

unit gas pressure is the same as specified on the rating 

plate . If necessary, pressure adjustments must be made at 

the pressure regulator . 

G .  If it is a completely new installation, have gas lines, 

meter size piping and piping installed and checked by a 

qualified gas technician .

H .  Make certain that the new piping, joints, and connections 

have been made in a clean manner and have been 

purged, so that the piping compound, chips, etc ., will not 

clog pilots, valves, and/or controls . Use pipe joint sealant 

that is resistant to liquefied petroleum gas .

WARNING:  Check gas connections for leaks . Use a soap 

solution or similar means .

 Do Not Use An Open Flame!

Gas Connections:

All broilers have a rear gas 3/4” NPT or 3/4”-14NPT 

connections . CE models have 3/4”-14 NPT thread which 

includes an adapter . 

NOTE:  Adequate clearance must be provided for servicing 

and proper operation .

Counter Line Installations

Location

Unpack units carefully and provide the necessary space 

on counter or back bar . All units must be installed in non-

combustible locations .

A .  Location of the unit should be in an area where  

make-up air is available to support proper combustion . 

Make-up air should be supplied in such a manner as to 

pass through the front of the unit . Do not obstruct front-

air flow .

B .  In accordance with standard gas appliance operation, 

the unit should be located under a ventilation hood of 

applicable size and capacity . See ventilation instructions

Sanitary Counter Top Seal

When the broiler is installed on a counter top, the National 

Sanitation Foundation, (NSF), recommends that it be 

sealed in accordance with NSF standards per the following 

instructions:

1 .  Unit should be located on a non-combustible, level 

counter top surface .

2 .  Thoroughly clean the bottom perimeter of the broiler and 

the counter top around the bottom of the broiler .

3 .  Apply a generous bead of silicone sealant around the 

entire outside perimeter of the broiler bottom .

4 .  The broiler can be secured to the counter top by inserting 

the 3/8-inch diameter crating bolts through the counter 

from the bottom, (via predrilled 1/2” diameter holes), and 

threading them into the nut inserts in the bottom of the 

unit .

5 .  Smooth the silicone sealant with a finger or tool to 

provide a cover seal

Summary of Contents for G18-BRL

Page 1: ...624 5669 Enodis UK LTD 5E Langley Business Centre Station Road Langley SL3 8DS Great Britain Phone 01753 485900 Fax 01753 4859011 Part 4525958 10 28 08 2008 Garland Commercial Industries Inc FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS OR LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE WARNING IMPROPER INSTALLATION ADJUSTMENT ALTERATION SERVICE OR MAINTENANCE CAN C...

Page 2: ...ould expose you to airborne particles of glass wool ceramic fibers Inhalation of airborne particles of glass wool ceramic fibers is known to the state of california to cause cancer Operation of this product could expose you to carbon monoxide if not adjusted properly Inhalation of carbon monoxide is known to the state of california to cause birth defects or other reproductive harm Keep appliance a...

Page 3: ...TALLATION 7 Rating Plate Location 7 Statutory Regulations 7 Australia Specific Clause 7 Gas Supply 8 Gas Connections 8 Counter Line Installations 8 Location 8 Sanitary Counter Top Seal 8 Leg Installation 9 Assembly of Counter Stands 9 Installation for Units Equipped with Casters 10 Cabinet Bases 10 Assembly Of Broiler 10 Ventilation 10 OPERATION 11 Grid Rack Seasoning Instructions 11 Lighting Inst...

Page 4: ...F18 BRL 18 457mm 25 1 8 636mm 34 1 2 876mm 190 86 21 3 45 000 13 2 GF24 BRL 24 610mm 25 1 8 636mm 34 1 2 876mm 240 109 21 4 60 000 17 6 GF30 BRL 30 762mm 25 1 8 636mm 34 1 2 876mm 290 131 29 5 5 75 000 22 GF36 BRL 36 914mm 25 1 8 636mm 34 1 2 876mm 340 154 29 5 6 90 000 26 4 NOTE Only GF series broilers with flame failure features are CE approved A REAR GAS CONNECTION 1 3 8 45mm 34 1 2 876mm 24 1 ...

Page 5: ...4 375mm 5 125mm DIMENSIONS AND SPECIFICATIONS BROILERS continued Gas Pressure North America General International Markets Operating Manifold Pressure Natural G20 4 5 wc 11 2mbar LPG G31 10 wc 24 9mbar Australian Market Operating Manifold Pressure Natural 4 wc 1 0kPa LPG 10 wc 2 49 kpa Input Per burner MJ H Injector Dia MJ H Injector Dia 15 8 1 9 mm 15 8 1 1 mm Clearances For use in non combustible...

Page 6: ...0 BRL 29 5 50 23 G36 BRL CAB Closed Cabinet 36 914mm Wide G36 BRL GF36 BRL 29 5 60 27 G48 BRL CAB Closed Cabinet 48 1219mm Wide G48 BRL 37 65 29 5 Many local codes exist and it is the responsibility of the Owner and the Installer to comply with those codes Garland reserves the right to change or improve product specifications without notification Garland products are not approved or authorized for...

Page 7: ...luding the prefix and suffix letters and numbers and the warranty serial number The rating plate affixed to the unit contains this information We suggest installation maintenance and repairs should be performed by your local authorized service agency listed in your information manual pamphlet In the event you have any questions concerning the installation use care or service of the product write o...

Page 8: ...ompletely new installation have gas lines meter size piping and piping installed and checked by a qualified gas technician H Make certain that the new piping joints and connections have been made in a clean manner and have been purged so that the piping compound chips etc will not clog pilots valves and or controls Use pipe joint sealant that is resistant to liquefied petroleum gas WARNING Check g...

Page 9: ... a spirit level and level unit by cooking grids four 4 ways across the front and back and down the sides Assembly of Counter Stands 1 Fit stand ends together see diagram 2 Secure stand together with eight 8 10 24 machine screws eight 8 1 4 lock nuts eight 8 10 24 hex nuts provided Use only front and back pieces 3 If stand exceeds a four 4 foot length see optional cross member Optional cross member...

Page 10: ...RL or 2 sets of 21 533mm 48 BRL long steel rods These rods are to be installed in the grooves on the support brackets which are atop the burners INSTALLATION continued Briquettes For best cooking results it is recommended that the correct amount of briquettes are installed in the broiler Refer to the table and drawing below for the proper arrangement of briquettes When all the briquettes have been...

Page 11: ... Models G 18 24 39 36 48 BRL 1 One pilot serves two burners and is located between those burners 2 Push red spark buttons several times to ignite pilot burners 3 Ensure pilots are lit by viewing through pilot view hole on front of unit Models GF 18 24 30 36 BRL 1 Push in the valve knob and turn counter clockwise to the ignition position 2 While holding the knob fully in depress the ignitor button ...

Page 12: ...FF at end of daily operation 7 When the grill is running never use objects such as sheet pans to cover the gill in order to hold in heat in an attempt to burn off grease or other debris Exterior Finish Cleaning Establish a regular schedule Any spills should be wiped off immediately 1 Wipe exposed clean able surface when cool with a mild detergent and hot water Stubborn residue spots may be removed...

Page 13: ...Part 4525958 10 28 08 Page 13 ...

Page 14: ...Part 4525958 10 28 08 Page 14 ...

Page 15: ...Part 4525958 10 28 08 Page 15 ...

Page 16: ......

Reviews: