background image

Document Number: GAR_IS_4601787   rev 0   (12/15) 5

Section 2

Installation Procedures

n

Warning

Always disconnect electrical power before removing panels.
Broiler temperature extremely high, be very careful.

1.  Lower the top platen 

and remove the left 

lower side panel, four (6) 

screws using  Phillips #2 

screwdriver.

2.  Remove the 2 existing screws from the SIB 

board using a phillip screwdriver. Store screws and 

washer in safe place.

3.  Starting from right to left, disconnect the first 

thermocouple plug from the SIB board, and connect 

it to the noise reduction board (NRB). Repeat 

process for every wire.

first one install into the noise reduction board

all plugs installed into the noise reduction board

4.  Now move the noise reduction board (NRB) 

aside and start connecting the plug from the NRB 

to the SIB board. Same order as the previous plugs 

connected, right to left. Repeat process for every 

wire plug.

IMPORTANT NOTE

Tug each wire plug to make sure all connectors are firmly 

attached and secure.

Noise Reduction Board (NRB) Installation Procedure

Summary of Contents for CXBE12

Page 1: ...Electric Dual Side Clamshell Broiler Model CXBE12 CFA Noise Reduction Board Installation Instructions Document Number GAR_IS_4601787 rev 0 12 15...

Page 2: ...mage to the appliance and or property could result Notic This appliance is intended for commercial use only and should only be operated by fully trained and qualified personnel Notic Scrape the grease...

Page 3: ...2 15 3 Safety Notices 2 Section 1 Kit Components Noise Reduction Board Installation Kit Components 4 Section 2 Installation Procedures Noise Reduction Board NRB Installation Procedure 5 Section 3 Diag...

Page 4: ...N QTY 4600681 Noise Reduction Board 1 4600683 Wire completed with terminal 6 4601745 Wire TC Extension PCB Power 1 F646 Extender Bolt Standoff M F 6 32 x 0 437 2 F162 Screw 6 32 x 1 4 2 F693 Lockwashe...

Page 5: ...e 3 Starting from right to left disconnect the first thermocouple plug from the SIB board and connect it to the noise reduction board NRB Repeat process for every wire first one install into the noise...

Page 6: ...extender bolt to the SIB board on each side Tighten bolt 6 Place the NRB on top of the SIB board and gently tighten with the screws 7 Plug the red black cable plug from the NRB to the SIB board male...

Page 7: ...FS37 FS38 FS39 FS40 FS41 FS5 FS3 PLATEN TERMINAL BLOCK T39 T38 S23 S25 T1 T2 T3 P16 P1 FS7 FS8 FS18 FS19 P11 FUSE 5A T18 T19 FH1A FH1B BR1 P6 P7 RT4 RT5 FS42 FS43 SPEAKER RT6 GROUND FRONT RT9 GROUND...

Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Page 9: ...cycle count 04 Install board and heat unit 05 Run several test cycles 3 4 without product to see if any errors occur 06 Ask Operator to perform Product Integrity Testing on chicken ensuring within the...

Page 10: ...level of service that meets your operational needs from one restaurant to multiple locations StarCare Warranty lifetime service certified OEM parts global parts inventory performance audited ExtraCar...

Reviews: