34
ENGLISH
ATTENTION ! Each purlin is designed to be perfectly aligned with the gables.
Check the inclination of each purlin to ensure correct positioning.
Consolidate the construction with the 4 storm battens (parts S) fastened to the inside of the
front and rear walls with M8x60 bolts. These parts are screwed after having tightened the
side wall planks, as well as the planks and the front and rear gables.
NOTE :
ث
The hurricane battens should only be screwed against the bottom plank and the first gable
beam at the top;
ث
M8x60 bolts should not be over-tightened to allow the planks to work.
⑥
DOOR INSTALLATION
ITEM
DESCRIPTION
DIMENSIONS (MM)
QTY
I
Right and left door (semi-glazed)
700 x 1585 mm
2
Place the 2 doors (part I) on the hinges.
I
I
I
I
I1
I1
I2
I3
Summary of Contents for 22196
Page 9: ...9 FRAN AIS POSE DE LA BASE PLAN DE MONTAGE PAR TAPES DESSINS A A B H1 H1 OUTILS NECESSAIRES...
Page 28: ...28 ENGLISH BASE INSTALLATION STEP BY STEP ASSEMBLY PLAN SKETCHES A A B H1 H1 NECESSARY TOOLS...
Page 85: ...85 ITALIANO INSTALLAZIONE DELLA BASE FASI DI MONTAGGIO DISEGNI A A B H1 H1 STRUMENTI NECESSARI...
Page 104: ...104 POLSKI U O ENIE PODSTAWY PLAN MONTA U KROK PO KROKU RYSUNKI A A B H1 H1 WYMAGANE NARZ DZIA...
Page 137: ......