13-11-608 Page 52
Initial Set-Up and Operation:
The RO system is fully assembled and integrated into the compressor package.
As delivered, the new RO membrane contains a FDA approved preservative solution to prevent
microbiological growth and freezing. This preservative will be flushed during the initial hours of operation.
Adjusting the cycle timer.
The frequency of fill-up cycles ultimately depends on the quality of the water within the main reservoir.
Cycle times of 3 days “off” and 3 minutes “on” typically yield acceptable results – injection water TDS level
is held below 60ppm and no suspended solids form. To conserve water, longer “off” time cycles may be
used if the resulting injection water quality does not exceed 60 ppm and no suspended solids form.
Adjustment of the timer for 3 days “off” and 3 minutes “on” cycles is accomplished by interconnecting PLC
terminal 4, 6, 7, and 9 with jumper wires. Refer to Fig 8-1 for PLC connections and cycle-time
combinations available.
Figure 8-1 – PLC CONNECTIONS AND CYCLE TIME COMBINATIONS
Reverse Osmosis Cycle Time Table
Connect Wire # 9 to PLC Input
Terminals (shown by “X”)
Time On
Time Off
4
5
6
7
3 Min.
1 Day
X
3 Min.
2 Days
X
3 Min.
3 Days
X
X
3 Min.
5 Days
X
3 Min.
7 Days
X
X
Fill 4 Hr.
X
X
5 Min.
1 Day
X
X
5 Min.
2 Days
X
X
5 Min.
3 Days
X
X
X
5 Min.
5 Days
X
X
5 Min.
7 Days
X
X
X
Fill 8 Hr.
X
X
X
Test 5 Sec.
Test 10 Sec.
X
X
X
X
Summary of Contents for PUREAIR EWD99E
Page 7: ...13 11 608 Page 2 Figure 1 2 PACKAGE ILLUSTRATION AIR COOLED 302EWD797 A Ref Drawing...
Page 8: ...13 11 608 Page 3 Figure 1 3 PACKAGE ILLUSTRATION WATER COOLED 303EWD797 A Ref Drawing...
Page 9: ...13 11 608 Page 4 Figure 1 4 WATER COOLED SCHEMATIC 300EWD797 D Ref Drawing...
Page 10: ...13 11 608 Page 5 Figure 1 5 AIR COOLED SCHEMATIC 301EWD797 D Ref Drawing...
Page 30: ...13 11 608 Page 25 Figure 4 2 FLOW CHART FOR SETUP PROGRAMMING 300EWC1255 Ref Drawing...
Page 44: ...13 11 608 Page 39 301EWD546 B Ref Drawing Page 2 of 2...
Page 46: ...13 11 608 Page 41 302EWD546 B Ref Drawing Page 2 of 2...
Page 48: ...13 11 608 Page 43 303EWD546 B Ref Drawing Page 2 of 2...