Page 16
FIGURE 3-1 indicates API-GL5 oil grades
recommended for use in the pump power end
and the gear reducer lube system. Crankcase
operating temperature ranges and minimum
startup temperatures for each listed grade of oil
for various inlet or sump temperature ranges.
FIGURE 3-1: Lubricant Recommendations
PLUNGER / PACKING LUBRICATION
The fluid end plungers are lubricated from a
separate lubrication pump through the
stuffing box. The lubrication pump, hosing,
and check valve to the stuffing box is not
provided with the unit.
See
"Plunger
Packing
Lubrication
Recommendation Chart," page 19, for a list
of lubricants recommended for plunger
/packing lubrication.
STARTUP AND NEW PUMP RUN-IN
PROCEDURES
A centrifugal charge pump will be required
to charge the fluid end suction manifold.
The charge pump should be sized according
to the volume to be pumped by the
quintuplex pump so that there is no less
than 50 psi charge when the triplex pump
operates at its maximum flow.
The first startup and several hours of the
pump run-in are performed at the factory
during the acceptance tests as a part of
quality assurance procedure. However, the
new pump break-in period process may
continue for the first 80-100 hours of
operation, and therefore it will be each
user’s responsibility to perform all the tasks
related to this critical period. As all moving
parts of the pump go through wearing-in
process, steel and bronze wear particles are
carried by the oil flow in the lubrication
system. The resulting contamination of the
lubrication system with the wear particles
and especially clogging of the strainer and
the oil filter may cause serious problems. To