ASSEMBLY INSTRUC TIONS
4
6
5
4. Move umbrella base assembly to desired
location, ensuring it is level. Insert sand inserts
(G) into the assembly, then fill with sand
(not included). Snap the preassembled buckles
on sand inserts (G) to secure.
Note: A minimum of 220 lbs. of sand is
needed to properly secure the umbrella.
5. Slide base cover (F) down base tube (C).
Secure the base cover (F) to the assembly with
the preassembled cover hooks.
5
6. Put base tube cover (L) on base tube (C).
Replace sunshade (K) in base tube (C),
securing with previously removed short bolt
(BB). Tighten with short wrench (EE).
Hardware Used
Short Wrench
1
Short Bolt
1
x
x
AA
BB
AA
EE
Lowes.com/gardentreasures
C
G
C
F
K
C
AA
BB
AA
EE
L
C