- -
7
ASSEMBLING THE MACHINE
(1)
Nomenclature
(2)Assembly
Put blow pipe B to the machine Put blow A to B by
by rotating rotating
IMPORTANT!
Whether the assembly of blower pipe is proper ornot will
influence the stable performance so before operate this machine
please make sure that it is properly assembled.
Use screw M5
×
10 to reinforce