Installation

The GAT NET.Controller 7000 master and slave controllers must be installed 
in the vicinity of the connected GAT NET.Lock 7000 locks to keep cable 
lengths to a minimum. Usually the controllers are stored on top of the 
lockers.
Although the permanent fixing of the controllers is not required, when a 
controller is to be permanently mounted, e.g., on a wall, use the 3 screw 
holes provided in the base of the controller. The housing does not have to 
be opened for this process.

Measurements for installation

Installation process

1.  Drill three mounting holes based on the measurements in the diagram 

above. Depending on the supporting surface, use the appropriate drill 
diameter for the screws and/or wall plugs (screws to max. M4).

2.   Screw in the top two screws approximately half way.
3.  Mount the controller housing on the top screws and push down until 

the housing stops against the screws. Tighten screws if necessary.

4. Screw the third screw into the bottom mounting hole and tighten firmly. 

5. Ensure the controller is secured firmly and cannot be removed.

1.

2.

3.

1.

2.

133 mm (5.24´´)

5.5 mm (0,22´´)

309.6 mm (12.19´´)

154.8 mm (6.09´´)

154.8 mm (6.09´´)

270.5 mm (10.65´´)

0.5 mm (0.02´´)

Ø 4.8 mm (0.19´´)

4.8 mm 
(0.19”)

4.8 mm 
(0.19”)