
Chapter 3: Unpacking and Installation--Assembly
3 - 3
2.
Insert bottom panel
•
slide bottom panel from the lower end inside the side panel assembly
•
standoffs of bottom panel
don’t have
to be inserted into clearance holes yet
3.
Connect door panel sub-assembly
•
connect front panel sub-assembly to one side panel using the quick-release hinges
•
open the door and slightly lift up the front part of the bottom panel with its standoffs
•
align front panel and connect other side using the quick-release hinges
4.
Mount bottom panel and feet
•
once the door panel sub-assembly is connected, align all four standoffs of bottom panel with
clearance holes and fully insert
•
lift the cage assembly and screw rubber bumper onto threaded studs
•
verify that the bottom panel if flush mounted
Summary of Contents for Faraday Shield
Page 1: ...Faraday Shield Operator s Manual...
Page 2: ......
Page 6: ...iv...
Page 8: ...Copyrights Inspection...
Page 21: ...Appendix A Specifications Physical location 3 9...