ESH150
–3PE~400V
Service manual
22/56
Ref. NR-000144-ENG
Use the proper size of cable according to the voltage, current and maximum power required by
the Unit.
The sizing of the cable is calculated for a length of 25m, for longer lengths you must
recalculate the appropriate section.
23 A @ 3PE~400V
Cable Section 6 mm
2
Make sure the power cable is disconnected from the mains source before connecting it
to the terminal strip in the console.
b) Put 18
litres of hydraulic oil in the unit’s oil tank. The oil should comply with the
characteristics and specifications of standard DIN 51524 sections 1 and 2 (for example
ISO VG 46).
PRECAUTION!
Do not fill the tank to its maximum capacity (22 litres); the oil level
should not exceed 85% of the maximum capacity (18 litres approx.). Use the visor of the
oil thermometer to check the oil level, as this should always be completely full (18 litres).
c) Check the oil level in the hydraulic pump by
removing the drain coupler from the pump and
making sure the oil level reaches the top of the filler
neck. Add oil if necessary and reconnect the
coupler.