background image

 

Version 1, 18 December 2020, Page 

2

 of 

12

 

PRE - INSTALLATION

 

 
IMPORTANT
:  
 

INSTALLATION  COMPLIANCE:

  Galvin  Specialised  products  must  be  installed  in  accordance  with  these 

installation instructions and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. 
Water and/or electrical supply conditions must also comply to the applicable national and/or state standards. Failing 
to comply with these provisions shall void the product warranty and may affect the performance of the product. 
(Refer supplied installation compliance sheet with the product).

 

Pipe sizing shall comply with AS/NZS 3500.1 and shall be hydraulically calculated.

 

Before proceeding with installation first check the solenoid valve supplied is suitable for the site water pressure 
and conditions. If your water pressure is outside the stated range, please contact Galvin Specialised. 

Ensure all supply lines are flushed thoroughly to remove debris prior to the installation of this product. A line 
strainer is supplied to protect the solenoid valve from debris.   

We recommended a pressure reduction valve may be required to comply with recommended maximum supply 
pressure. 

Ensure that access to the push button, solenoid valve and transformer/GPO is available for future maintenance 
when installing the components. It is recommended that isolating valves be installed upstream to the solenoid 
valve to allow for servicing. All wiring must be able to be removed when installed into cavities or walls, therefore, it 
is recommended that a minimum of 25mm conduit be used to house the leads. The unit is supplied with 5 meters 
of lead on the transformer and a 5 meters lead from the solenoid. Additional lead lengths may be accommodated 
up to a length of 5m but must be ordered separately. 

Whilst our product designs consider a broad range of installation types and surfaces, it is important that surfaces 
which fixtures are mounted to are flat and free from defect. This is especially important for our Flowmatic

®

 Safe-

Cell

®

 range where special attention is required to minimise ligature points and areas for concealment of 

contraband. In addition to ensuring the products are fitted securely and in accordance with the following 
instructions, consideration shall be given to the use of non-

pick mastics such as BASF Sonolastic “Ultra” to ensure 

a high quality and safe installation.

 

Most installation problems are due to damage to the unit during installation or the selection of an inappropriate 
installation location. Select the location carefully and take care with the installation, consider ease of operation for 
the end user.

 

Minimum DN25 copper supply line and 50mm flush pipe must be used and it will 90° (PVC adaptor to supplied by 
installer)  

The flush valve shall be installed such as to place the outlet at a minimum of 450mm above the rim of the pan. 

The pan has a maximum daily flush feature. The factory setting is 100 flushes per day (FPD). When this feature 
selected, that the maximum flushes have been used and flushing is locked for 24 hours from the time of the first 
use.

 

GENERAL INSTALLATION REQUIREMENTS 

 

Do not cut the wires or extended the existing leads without using a correct lead extension from Galvin Specialised, 
as this will void warranty. 

Suitable access to the service of all components must be provided. 

It is recommended that acoustic dampening products or materials be used in facilities where increased levels of 
sound protection is required. A water hammer arrestor may also be required. 

The number of valves and simultaneous demand must be considered when sizing pipes. If other fixtures are 
connected to the supply line, calculations of flow rates and pressures must be undertaken to ensure adequate 
water supply. 

Limit the number of changes of directions in pipe work.  This will result in less friction loss, better valve 
performance and reduce potential water cavitation noise. 

We recommended fitting isolating valves before solenoid for easy servicing. 

Do not apply heat near this product during connecting water line. Heat generated by soldering could damage 
plastic or electrical parts and seals, and will void the warranty.

 

For personal installation assistance and spare parts, please call our head office on 1300 514 074 and speak to our 
customer service staff.

 

Summary of Contents for Safe-Cell TZ-FLOWTPANMDT

Page 1: ...utton inputs and up to 2 solenoids single solenoid only for flushing units Controller is pre programmed and ready to use The solenoids will open for a specific time once the appropriate button is pres...

Page 2: ...quired to minimise ligature points and areas for concealment of contraband In addition to ensuring the products are fitted securely and in accordance with the following instructions consideration shal...

Page 3: ...mend 300mm from the centre of the outlet and at a suitable height or to project specification Cut out details for face plate Faceplate to suit wall thickness between 30mm to 240mm Ensure the cut out d...

Page 4: ...nyloc nuts and apply a thin bead of silicon on the edge of the wall cut out If extension leads are required please contact Galvin Engineering Do not force the faceplate to fit onto wall or attempt to...

Page 5: ...ic nylon or electrical parts and seals and will void the warranty Note Controller must be mounted away from any moisture or potential water splashing 4 Mount control module Attach the control module t...

Page 6: ...red please contact Galvin Specialised Do not cut the leads If the leads are too long it is recommended that any excess is coiled up and clipped to the wall 6 Connect power supply and check for correct...

Page 7: ...scanning the first thing to come up in available devices will be a Mac address that looks like this example AB EC 69 57 34 02 This will eventually change to the name of the device which is from factor...

Page 8: ...ory parameters will be downloaded to the app The Get log button will pop up the log data screen The Presets button will list all saved presets Drop Down menus First menu from left is to select the typ...

Page 9: ...p down menu The PB2 controller can be used for showers basins and pans Depend of the feature selection setting slides will appear e g there is only Run time to be set for basin Run and Lockout times f...

Page 10: ...nd Hygiene flush for full flush channel 2 and press Upload 10 Settings for shower PB2 controller is capable of controlling two buttons and two showers solenoids Select channel to be changed Select des...

Page 11: ...ck electrical connections Replace solenoid valve Water or structural damage to electrical components Replace damaged electrical components Incorrect connections Check all connections Damage to sensor...

Page 12: ...the only warranty given by the Galvin Engineering Pty Ltd With respect to the product Galvin Engineering Pty Ltd makes no other warranties express or implied Galvin Engineering Pty Ltd hereby specific...

Reviews: