background image

 

PRE-INSTALLATION - 

MOUNTING DETAILS

 

 

Main body

 

  Hole centres must be at 215mm ±0.5mm  

  This is critical to ensure easy installation  

  Wall spuds must be ½” BSP MI and protrude 

from the finished wall by no more than 15mm  

Wall flange

 

  Holes as per installation steps 4 & 5 

 

  

 

INSTALLATION

 

IMPORTANT:

 Galvin Specialised products must be installed in accordance with these installation instructions and 

in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical supply 
conditions  must  also  comply  to  the  applicable  national  and/or  state  standards.  Failing  to  comply  with  these 
provisions shall void the product warranty and may affect the performance of the product. 

 

 

1. Fit wall flange 

  Apply thread tape/sealant to wall spuds to ensure 

water tightness. 

  Remove tails from the

 body and fit to wall flanges.

 

 

Ensure o-rings are secured in the rear of the flanges 
then fit tails and flange assemblies to the wall spuds.

 

 

Tighten tails with supplied 12mm allen key until 
flanges are secured against the wall.  Take

 care not 

to overtighten.

 

2. Ezy-Wash

® 

body

 

  Check tails to ensure o-rings are fitted and 

are in good condition. 

 

Fit the Ezy-Wash

®

 body onto the tails until it 

sits flush against them. Take care not to 
damage the o-rings. 

Note:  A male thread 
connection on the tap may 
be more suited. If so, please 

contact us on 1300 514 074

 

Reviews: