Version 1,29
th
January 2021, Page
2
of
4
PRE-INSTALLATION
MOUNTING DETAILS
– HOLE CENTRES
−
If the mounting holes do not already exist, mark out and drill the holes in the wall/sheet, as shown in rough-in dimensions.
Note: Before installation, all lines must be flushed. We recommend that a line strainer be installed prior to drinking taps to
eliminate any foreign material.
INSTALLATION
IMPORTANT: Galvin Engineering products must be installed in accordance with these installation instructions and in
accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical supply
conditions must also comply to the applicable national and/or state standards. Failing to comply with these provisions
shall void the product warranty and may affect the performance of the product.
When applying thread tape or sealant to the inlet, ensure the opening is not blocked. Failure to do so may cause the
regulating screw to be blocked, which will affect the flow of water.
1. Fit tap assembly
−
Follow the rough in dimensions above and
ensure the orientation of the mounting holes is
as shown.
−
Fit supplied wall plugs.
−
Screw bottle filler assembly clockwise on wall
spud until it is in the correct position. Ensure
thread tape is used.
2. Secure the body
−
Secure the body with supplied screws.
Rough-in Dimensions