WARRANTY

 

The Galvin Engineering CliniMix

®

 Thermostatic Mixing Valve is guaranteed free from manufacturing faults for a 

period of 12 months, subject to the conditions and exclusions set out below; 

GALVIN ENGINEERING PRODUCT WARRANTY

 

Galvin Engineering products are warranted to be free from defects in materials and/or workmanship for a period 
of 12 months service life, and if found by Galvin Engineering to be so defective will be replaced as set out below. 
If the product is sold by a party other than Galvin Engineering, then it is sold by the seller as principal and the 
seller has no authority from Galvin Engineering to give any additional warranty on behalf of Galvin Engineering. 

The benefits of this warranty are in addition to all other rights and remedies which the purchaser may have under 
the Trade Practices Act or similar laws of each State and Territory in Australia.  

Warranty Conditions and Exclusions

 

Conditions: 

1.  The Thermostatic Mixing Valve (TMV) must have been installed by a licensed plumber in accordance with 

this document and in accordance with the National Plumbing and Drainage Code AS/NZS3500 (the Code) 
current at the date of installation and all relevant statutory and local requirements in the State or Territory in 
which the product is installed. 

2.  Where the product is installed outside the boundaries of a metropolitan area as defined by Galvin Engineering, 

the cost of transport insurance and travelling shall be the purchaser’s responsibility. 

3.  Where the TMV comprises part of a hot water system, installation of that system must be in accordance with 

its  manufacturer’s  recommendation,  the   ode  and  all  relevant  statutory  and  local   tate  or   erritory 
requirements.   

4.  The  TMV  must  be  returned  to  Galvin  Engineering  together  with  a  fully  and  correctly  completed  Galvin 

Engineering Warranty Claim Form. 

5.  Where the valve is replaced under warranty the replacement TMV carries a new warranty as detailed herein.  

Exclusions: 

Replacement  work  will  be  carried  out  as  set  out  in  the  Galvin  Engineering  Warranty  above,  but  the  following 
exclusions may cause the warranty to become void, and may incur a service charge including cost of parts where: 

1.  Damage has been caused by accident, Acts of God, misuse, incorrect installation, incorrect installation of the 

water supply system of which the product forms a part of attempts to disassemble the TMV. 

2.  It is found that there is nothing wrong with the product 

3.  The  failure of the TMV  is due  in part  or in whole to faulty manufacture/installation of  the hot  water supply 

system of which the product forms part. 

4.  The TMV has failed directly or indirectly as a result of excessive water pressure or temperature outside the 

Application Guidelines, thermal input or corrosive environment. 

5.  The TMV has failed due to foreign matter either from installation or the water supply. 

6.  The failure of the TMV is due to scale formation in the waterways of the TMV. 

7.  The failure of the TMV is due in part, or in whole, to installation not in conformance with the requirements of 

the Code. 

8.  Galvin  Engineering  reserves  the  right  to  change  its  specifications  without  prior  notice  and  will  not  accept 

liability for any claim arising from such change. 

9.  Subject to any statutory provisions to the contrary, claims for damage to furniture, carpets, walls, foundations 

or any other consequential loss either directly or indirectly due to leakage from the TMV are also excluded 
from warranty cover.

 

Summary of Contents for 101.10.70.10

Page 1: ...ng tempered water to the desired outlets This stainless steel hinged cabinet kit is a lockable cabinet with 20mm copper fittings 2 in and 1 out which allows secure installation and safe simple mainten...

Page 2: ...es 3 0 DESCRIPTION This manual covers the CliniMix Lead SafeTM TMV SS Cabinet Assembly with Universal Door 20 Bottom In Out These are designed to provide tempered water to the desired outlets This mix...

Page 3: ...APH The Galvin Engineering CliniMix Thermostatic Mixing Valve is suitable for many applications The Head loss Characteristic for Mixed Outlet Flow rate versus Balanced Inlet Pressure is shown below in...

Page 4: ...ction within specification on unequal pressures up to 6 1 The mixer has integral isolating valves which permit servicing of the strainer check valve flow regulator and thermostatic cartridge They are...

Page 5: ...ure to do this may void the warranty 3 Connect water lines Before connecting to water lines all lines must be flushed Remove protective vinyl cap from copper tubes Join each copper tube to the correct...

Page 6: ...rtest length of pipe work between the mixing valve and outlet fixture Allow the mixed outlet to flow for at least 60 seconds to allow the temperature to stabilise before taking a temperature reading a...

Page 7: ...Restore the cold water to the TMV After the mixed water temperature has stabilized note the outlet temperature ensuring the outlet temperature has reestablished Now repeat the above test except this t...

Page 8: ...st plugs in the top of the inlet fittings are tight and that there is no evidence of water leakage The TMV must then be recommissioned as per Section 7 0 including temperature adjustment and the shutd...

Page 9: ...rass top assembly screw out the plastic spindle and replace the smaller O ring 5 Carefully remove the spindle from the center of the body 6 Remove O ring from spindle Replace with O ring supplied in t...

Page 10: ...OR WM TMV1 1 2 WM ISO 1 INLET ISOLATOR ELBOWS PAIR FOR WM TMV1 1 3 WM NRV 1 INLET NON RETURN VALVE FOR WM TMV1 PAIR 1 4 WM STR 1 INLET STRAINERS FOR WM TMV1 PAIR 1 5 WM TPKIT 1 THERMOSTAT PISTON SHUTT...

Page 11: ...r s recommendation the ode and all relevant statutory and local tate or erritory requirements 4 The TMV must be returned to Galvin Engineering together with a fully and correctly completed Galvin Engi...

Page 12: ...ntrol valves to ensure inlet conditions are within range Clean strainers ensuring debris is removed Either full hot or cold flowing from the outlet fixture Valve is incorrectly set Hot Cold water has...

Page 13: ...___________________ Model No ________________________ Size _________ Valve Location Building _____________________________________________________________________ Valve Identification No _____________...

Page 14: ...k It is hereby certified that all the commissioning work has been carried out by the undersigned in accordance with the requirements of the Codes of Practice indicated prior Date of Valve Commissioned...

Page 15: ...Outlets in Use One Outlet in Use All Req d Outlets in Use 1 2 3 4 5 6 7 8 9 10 11 Give details of brand and model designation Commensurate with the design flow rate for the mixing valve Note An accura...

Page 16: ...e ______________________ Date _______________________ Maintenance Tests Yes Date of Previous Service ______________________________________________________________________ Previous Service carried out...