3. Seal outer faceplate and fit inner faceplate 

  Seal the outer faceplate to the wall using a 

suitable sealant.

 

  Insert the inner faceplate followed by the 

shower flange, ensuring the provided o-rings 
are in place 

4. Secure flange 

  Secure the flange with the three supplied screws. 

  Use supplied M4x20mm long screws, if not 

suitable change to M4x16mm long screws. 

  Wipe off excess sealant on the outer faceplate 

when secured to the wall. 

Note: 

Before tightening the flange make sure the handle 

fits correctly. Put screws into flange and tighten finger 
tight, the flange should still be able to move. Slide the 
handle onto spline and move the flange until central to 
the handle. Remove handle and tighten the screws (it is 
best to tighten the screws in sequence a little at a time to 
avoid the flange moving). Refit handle.

 

 

5. Fit handle 

  Secure the handle with supplied tamper proof screw. 

Ensure the handle is oriented correctly.

 

 
 

8.0 

OPERATION AND TESTING 

 
 
After installation, check for leaks and correct operation.  

 
As the handle is rotated anti-clockwise the delivered water progresses from cold through 
warm to the pre-set maximum temperature of approximately 41°C. 
 

 
 

 

Summary of Contents for CliniMix CP-BS

Page 1: ...s The GalvinCare paddle handle provides straight forward temperature control and minimises ligature risk Suitable for high and low pressure systems with a thermostatically controlled water temperature...

Page 2: ...e operation provided it is installed commissioned operated and maintained as per the recommendations outlined in this manual It should be noted however that this valve should not be considered as an a...

Page 3: ...cordance with the provisions of AS NZS 3500 Installations not complying with AS NZS 3500 may void the product and performance warranty provisions 7 0 INSTALLATION The CliniMix Thermostatic Progressive...

Page 4: ...s a split second it is still considered to be outside the operating conditions and may cause the valve to operate incorrectly In the event that this does occur measures must be taken to control the sp...

Page 5: ...Before tightening the flange make sure the handle fits correctly Put screws into flange and tighten finger tight the flange should still be able to move Slide the handle onto spline and move the flang...

Page 6: ...f the outlet temperature requires adjustment then follow the temperature adjustment in the installation instructions Shut Down Test Once the correct outlet temperature has been achieved the valves int...

Page 7: ...flow to stabilise for at least 15 seconds and record the temperature Quickly isolate the hot water supply to the valve The outlet flow should quickly reduce to be less than 0 4L min following the isol...

Page 8: ...a time to avoid the flange moving Refit handle 8 Fit the handle and fasten so the arrow shape on top of the handle matches the marking on the faceplate 11 0 ADJUSTMENT OF THE MIX TEMPERATURE 1 Set the...

Page 9: ...ove cartridge nut and check cartridge Unscrew cartridge and remove from body Check the cartridge for wear and damage Replace if required replacement cartridge available through your supplier Check and...

Page 10: ...mperature outlet then a 6 monthly servicing cycle may be adopted Otherwise servicing checks should be carried out more frequently e g every 4 months Follow the recommended maintenance procedures detai...

Page 11: ...aged Raise hot water temperature Clean the cartridge ensuring that all debris is removed Mix temperature unstable Flow rate below 2L min Thermostatic cartridge contains debris or is damaged Strainers...

Page 12: ...hat system must be in accordance with its m nuf turer s re mmend t n the C de nd re ev nt st tut ry nd t te r Terr t ry requ rements 4 The valve must be returned to Galvin Engineering together with a...

Page 13: ...Pressure ________kPa Cold Water Pressure _______kPa Make of Mixing Valve _______________________ Model No ________________________ Size _________ Valve Location Building ______________________________...

Page 14: ...k It is hereby certified that all the commissioning work has been carried out by the undersigned in accordance with the requirements of the Codes of Practice indicated prior Date of Valve Commissioned...

Page 15: ...f Warm Water C One Outlet in Use All Req d Outlets in Use One Outlet in Use All Req d Outlets in Use 1 2 3 4 5 6 7 8 9 10 11 Give details of brand and model designation Commensurate with the design fl...

Page 16: ..._______________________________Signature ______________________ Date _______________________ Maintenance Tests Yes Date of Previous Service ______________________________________________ Previous Serv...

Reviews: