16.0  

WARRANTY

 

The Galvin Engineering CliniMix Thermostatic Progressive Mixing Valves is guaranteed free from manufacturing 
faults for a period of 12 months, subject to the condition outlines below; 

GALVIN ENGINEERING PRODUCT WARRANTY 

Subject to the warranty conditions and exclusions set out below, Galvin Engineering products are warranted to be free 
from defects in materials and/or workmanship for a period of 12 months service life, and if found by Galvin Engineering 
to be so defective will be replaced as set out below. If the product is sold by a party other than Galvin Engineering, then 
it is sold by the seller as principal and the seller has no authority from Galvin Engineering to give any additional warranty 
on behalf of Galvin Engineering. 

The  benefits  of  this  warranty  are  in  addition  to  all  other  rights  and  remedies  which  the  purchaser  may  have  under  the 
Trade Practices Act or similar laws of each State and Territory in Australia. 

Warranty Conditions and Exclusions 

Conditions: 

1.  The TMV must have been installed by a licensed plumber in accordance with the Galvin Engineering Installation 

Instructions and Application Guidelines supplied with the valve, in accordance with local Plumbing and Drainage 
Codes at the date of installation and all relevant statutory and local requirements in which the product is installed. 

2.  Where the product is installed outside the boundaries of a metropolitan area as defined by Galvin Engineering, the 

cost of transport insurance and travelling sha

    e the pur h ser’s responsibility. 

3.  Where the valve comprises part of a hot water system, installation of that system must be in accordance with its 

m nuf  turer’s re  mmend t  n, the C de  nd     re ev nt st tut ry  nd        t te  r Terr t ry requ rements.   

4.  The valve must be returned to Galvin Engineering together with a fully and correctly completed Galvin Engineering 

Warranty Claim Form. 

5.  Where the valve is replaced under warranty the replacement valve carries a new warranty as detailed herein

.  

Exclusions: 

Replacement work will be carried out as set out in the Galvin Engineering Warranty above, but the following exclusions 
may cause the warranty to become void, and may incur a service charge including cost of parts where: 

1.  Damage has been caused by accident, Acts of God, misuse, incorrect installation, incorrect installation of the water 

supply system of which the product forms a part or attempts to disassemble the valve. 

2.  It is found that there is nothing wrong with the product 

3.  The failure of the valve is due in part or in whole to faulty manufacture/installation of the hot water supply system of 

which the product forms part. 

4.  The valve has failed directly or indirectly as a result of excessive water pressure or temperature outside the Supply 

Pressure Requirements, or corrosive environment. 

5.  The valve has failed due to foreign matter either from installation or the water supply. 

6.  The failure of the valve is due to scale formation in the waterways of the valve. 

7.  The failure of the valve is due in part, or in whole, to installation not in conformance with the requirements of the 

Code. 

8.  Galvin Engineering reserves the right to change its specifications without prior notice and will not accept liability for 

any claim arising from such change. 

9.  Subject to any statutory provisions to the contrary, claims for damage to furniture, carpets, walls, foundations or any 

other consequential loss either directly or indirectly due to leakage from the valve are also excluded from warranty 
cover.

 

Summary of Contents for CliniMix CP-BS

Page 1: ...s The GalvinCare paddle handle provides straight forward temperature control and minimises ligature risk Suitable for high and low pressure systems with a thermostatically controlled water temperature...

Page 2: ...e operation provided it is installed commissioned operated and maintained as per the recommendations outlined in this manual It should be noted however that this valve should not be considered as an a...

Page 3: ...cordance with the provisions of AS NZS 3500 Installations not complying with AS NZS 3500 may void the product and performance warranty provisions 7 0 INSTALLATION The CliniMix Thermostatic Progressive...

Page 4: ...s a split second it is still considered to be outside the operating conditions and may cause the valve to operate incorrectly In the event that this does occur measures must be taken to control the sp...

Page 5: ...Before tightening the flange make sure the handle fits correctly Put screws into flange and tighten finger tight the flange should still be able to move Slide the handle onto spline and move the flang...

Page 6: ...f the outlet temperature requires adjustment then follow the temperature adjustment in the installation instructions Shut Down Test Once the correct outlet temperature has been achieved the valves int...

Page 7: ...flow to stabilise for at least 15 seconds and record the temperature Quickly isolate the hot water supply to the valve The outlet flow should quickly reduce to be less than 0 4L min following the isol...

Page 8: ...a time to avoid the flange moving Refit handle 8 Fit the handle and fasten so the arrow shape on top of the handle matches the marking on the faceplate 11 0 ADJUSTMENT OF THE MIX TEMPERATURE 1 Set the...

Page 9: ...ove cartridge nut and check cartridge Unscrew cartridge and remove from body Check the cartridge for wear and damage Replace if required replacement cartridge available through your supplier Check and...

Page 10: ...mperature outlet then a 6 monthly servicing cycle may be adopted Otherwise servicing checks should be carried out more frequently e g every 4 months Follow the recommended maintenance procedures detai...

Page 11: ...aged Raise hot water temperature Clean the cartridge ensuring that all debris is removed Mix temperature unstable Flow rate below 2L min Thermostatic cartridge contains debris or is damaged Strainers...

Page 12: ...hat system must be in accordance with its m nuf turer s re mmend t n the C de nd re ev nt st tut ry nd t te r Terr t ry requ rements 4 The valve must be returned to Galvin Engineering together with a...

Page 13: ...Pressure ________kPa Cold Water Pressure _______kPa Make of Mixing Valve _______________________ Model No ________________________ Size _________ Valve Location Building ______________________________...

Page 14: ...k It is hereby certified that all the commissioning work has been carried out by the undersigned in accordance with the requirements of the Codes of Practice indicated prior Date of Valve Commissioned...

Page 15: ...f Warm Water C One Outlet in Use All Req d Outlets in Use One Outlet in Use All Req d Outlets in Use 1 2 3 4 5 6 7 8 9 10 11 Give details of brand and model designation Commensurate with the design fl...

Page 16: ..._______________________________Signature ______________________ Date _______________________ Maintenance Tests Yes Date of Previous Service ______________________________________________ Previous Serv...