© Galvin Engineering Pty Ltd
Product Installation Guidelines
Version 1, 19 October 2022, Page
17
of
25
5.
t v te the “Temp r ry Off” fun t n nd reassemble the faceplate and spout.
11.2
REMOVAL AND INSPECTION OF CARTRIDGE
1. After checking that supply conditions are within the
specified parameters (see
Error! Reference
source not found.
), if the mixer malfunctions or
should the test results fail to fall within the specified
limits consider replacing the cartridge with a new
one (see section 11.3 Important Notes On Debris).
Afterwards, Follow the steps in section 10.2.2
Thermostatic Cartridge to remove and inspect
cartridge.
2. Set the temperature as per step 5 in section 11.1
3. Re-commission the mixer as per commissioning procedure
(See section 8.0 Commissioning). Record the mixed water temperature.