![Galletti MPE series Installation, Use And Maintenance Manual Download Page 25](http://html.mh-extra.com/html/galletti/mpe-series/mpe-series_installation-use-and-maintenance-manual_559188025.webp)
25
All copying, even partial, of this manual is strictly forbidden
RG66007169 - Rev 00
3
PLUMBING AND ELECTRICAL CONNECTIONS
3.1
PLUMBING CONNECTION
3.1.2
RECOMMENDED WATER CIRCUIT
3.1.3
FILLING THE SYSTEM
- Before you start filling, make sure that the system drainage cock is closed.
- Open all the air vent valves of the system and of the indoor units and chiller.
- Open the system regulating devices.
- To fill the circuit open slowly the water tap of the system (optional).
- When water starts coming out of the air vent valves of the indoor units, close them and continue filling until the pressure gauge reading is 1.5 bars.
OPTIONAL
LEGEND
VS
Safety
valve
EV
Evaporator
PD
Water differential pressure switch
MA
Water
gauge
VAS
Air bleed hole
SA
Storage
tank
VE
Expansion
vessel
RS
Drain
RC
Water
charge
VI
Regulation valve (not supplied)
GA
Vibration-damping coupling (not supplied)
FM
Mechanical filter (OBLIGATORY)
VNR
Check valve (not supplied)